For projects in Jeddah
Recording studio acoustics and soundproofing in Jeddah
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Jeddah job
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.
Work reaching us from Jeddah is mostly hotels and hospitality, corporate offices, apartments, hospitals, schools, retail.
- The port is at the city Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- A gateway for pilgrimage hospitality Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Coastal humidity PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Jeddah.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Jeddah, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Jeddah, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Jeddah, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
For a Jeddah practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What decides the build-up in Jeddah
- The port is at the city
Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- A gateway for pilgrimage hospitality
Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Coastal humidity
PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Guest rooms fail at the door
Corridor noise and the next room cause more complaints than room acoustics. Door and wall detailing is where the work is.
- The housing stock
Villas and apartment blocks are concrete and block with hard stone or tile throughout. Mass is there, but every room is live and impact noise between floors is untreated.
- The studio and content scene
Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.
04 / Room by room
Where the money goes on a Jeddah project
-

Isolation
A measured background level, agreed before anything is bought. Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- Acoustic foam and BassBloc, 1800 x 900 mm
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Acoustic foam and BassBloc, 20 mm
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
-

Early reflections
Controlled at the mix position, and only there. PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Acoustic foam and BassBloc, 100 kg per cubic metre
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate
The Jeddah climate decides the material list
Jeddah is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Where a consultant is already engaged on a Jeddah project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
Buying foam to solve an isolation problem
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating the room before the shell is isolated
Small on the drawing, expensive on site, and almost always found after handover.
-
Killing the room completely and calling it controlled
We would rather calculate the area and sell you less of it than line every surface and call it thorough.
-
Treating it as a generic Jeddah job
Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
05 / Logistics
Supply into Jeddah, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jeddah, then a short road run or onward inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Jeddah |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Jeddah, then a short road run to site or onward inland. Air freight for samples and urgent quantities.
Questions from Jeddah projects
What makes recording studio acoustics and soundproofing different in Jeddah?
Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve. Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
Where should the budget go first on a Jeddah project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Jeddah?
No. We manufacture in India and supply into Jeddah. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Jeddah site?
ships from: Palwal, Haryana, India, arrives at: Jeddah, then a short road run or onward inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.