Home > Istanbul > Venue and restaurant acoustics

Nightclub and premium restaurant interior with acoustic treatment

For projects in Istanbul

Venue and restaurant acoustics in Istanbul

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other.
Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Istanbul job

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.

Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

Work reaching us from Istanbul is mostly apartment blocks, hotels, offices and towers, restaurants, hospitals, schools.

  • Built to move Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
  • Concrete blocks, live rooms The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.
  • A city that never goes quiet Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.
  • Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Istanbul.

Nightclub and venue soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

What goes where, from the structure in

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Istanbul, split units and VRF with condensers on facades and in light wells close to bedrooms.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Istanbul, mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

  3. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 3

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Istanbul, classrooms are concrete and tile with large class sizes and long hard corridors.

    Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What we see driving Istanbul briefs

  • Built to move

    Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

  • Concrete blocks, live rooms

    The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.

  • A city that never goes quiet

    Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.

  • Turkey manufactures too

    Domestic supply exists, so we are worth importing where the specification, the colour consistency or the supply chain is the reason.

  • Assembly and performance rooms

    Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

04 / Room by room

Room by room, on a typical Istanbul job

  • Wall and ceiling soundproofing layers

    Containment

    Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

  • Walls with wood wool, felt and wooden slats

    Table level comfort

    Absorption at the ceiling so guests stop raising their voices at each other. The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.

  • Ceiling baffles and clouds in hospitality space

    Entrance and service

    Doors, lobbies and extract paths, which is where most of the leakage actually is. Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate and durability

The Istanbul climate decides the material list

Istanbul is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Straight talk

The six errors that cost the most

  • Panels on the wall as a neighbour noise solution

    Small on the drawing, expensive on site, and almost always found after handover.

  • A lobby with both doors able to open at once

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Extract ducting that bypasses every wall you built

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Treating it as a generic Istanbul job

    Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

05 / Supply

What the route into Istanbul actually looks like

Supply into Istanbul
Ships fromPalwal, Haryana, India
Arrives atAmbarlı or Mersin, then road to site
Dispatch4 to 7 working days
FreightSea via Ambarlı
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Ambarlı or Mersin, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Istanbul projects

What makes venue and restaurant acoustics different in Istanbul?

Mosques, cultural centres and function halls are tall hard volumes carrying amplified speech. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

Where should the budget go first on a Istanbul project?

Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.

Do you have an office or installation team in Istanbul?

No. We manufacture in India and supply into Istanbul. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Istanbul site?

ships from: Palwal, Haryana, India, arrives at: Ambarlı or Mersin, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.