Home > Istanbul > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Istanbul

HVAC, plant and machine noise control in Istanbul

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and VRF with condensers on facades and in light wells close to bedrooms.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The product

What this material is and where it earns its place in Istanbul

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units and VRF with condensers on facades and in light wells close to bedrooms.

Work reaching us from Istanbul is mostly apartment blocks, hotels, offices and towers, restaurants, hospitals, schools.

  • Built to move Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
  • Concrete blocks, live rooms The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.
  • A city that never goes quiet Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Istanbul.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Istanbul, split units and VRF with condensers on facades and in light wells close to bedrooms.

    On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Istanbul, mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.

    Corner loading. Low frequency energy collects in corners, so absorber in the corners does more than the same area spread across a wall.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Istanbul, classrooms are concrete and tile with large class sizes and long hard corridors.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

Architects working in Istanbul usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / On the ground

The Istanbul conditions that change the answer

  • Built to move

    Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

  • Concrete blocks, live rooms

    The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.

  • A city that never goes quiet

    Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.

  • Turkey manufactures too

    Domestic supply exists, so we are worth importing where the specification, the colour consistency or the supply chain is the reason.

  • Plant and HVAC

    Split units and VRF with condensers on facades and in light wells close to bedrooms.

04 / Room by room

Space by space, for Istanbul briefs

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate

Durability in Istanbul, before acoustics is discussed

Istanbul is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

On a Istanbul job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

Six mistakes that turn into a second fit-out

  • Absorption on the office wall for a plant room problem

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Istanbul job

    Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

05 / Supply

Getting it to Istanbul, with real dates

Supply into Istanbul
Ships fromPalwal, Haryana, India
Arrives atAmbarlı or Mersin, then road to site
Dispatch4 to 7 working days
FreightSea via Ambarlı
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Ambarlı or Mersin, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Istanbul projects

What makes HVAC, plant and machine noise control different in Istanbul?

Split units and VRF with condensers on facades and in light wells close to bedrooms. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.

Where should the budget go first on a Istanbul project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Istanbul?

No. We manufacture in India and supply into Istanbul. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Istanbul site?

ships from: Palwal, Haryana, India, arrives at: Ambarlı or Mersin, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.