For projects in Istanbul
Office acoustics and soundproofing in Istanbul
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units and VRF with condensers on facades and in light wells close to bedrooms.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this material is and where it earns its place in Istanbul
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Split units and VRF with condensers on facades and in light wells close to bedrooms.
Work reaching us from Istanbul is mostly apartment blocks, hotels, offices and towers, restaurants, hospitals, schools.
- Built to move Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
- Concrete blocks, live rooms The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.
- A city that never goes quiet Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Istanbul.
Office and conference room acoustics Acoustic office screens
02 / The build-up
The build-up, layer by layer
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Istanbul, split units and VRF with condensers on facades and in light wells close to bedrooms.
Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Istanbul, mosques, cultural centres and function halls are tall hard volumes carrying amplified speech.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Istanbul, classrooms are concrete and tile with large class sizes and long hard corridors.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
For a Istanbul practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What decides the build-up in Istanbul
- Built to move
Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
- Concrete blocks, live rooms
The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.
- A city that never goes quiet
Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.
- Turkey manufactures too
Domestic supply exists, so we are worth importing where the specification, the colour consistency or the supply chain is the reason.
- Plant and HVAC
Split units and VRF with condensers on facades and in light wells close to bedrooms.
04 / Room by room
Room by room, on a typical Istanbul job
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
- Ceiling baffles and clouds, 100% PET non-woven, the panel family
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. The structure carries mass, so the recurring problems are impact through slabs and interiors with nothing soft in them.
- Ceiling baffles and clouds, 9 to 24 mm
- PET felt acoustic panels, 4 to 24 mm
- Acoustic panels, ASTM C423
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Traffic, ferries and street life reach rooms through glazing rather than walls. Fix the facade path before the wall.
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Istanbul interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Why the climate in Istanbul changes the material, not the target
Istanbul is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Worth knowing
Where this kind of project usually fails
-
Lining every wall while leaving the ceiling bare
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating a privacy problem with absorption
Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.
-
Glass cabins specified without a door and head detail
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Istanbul job
Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
05 / Logistics
What the route into Istanbul actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Ambarlı or Mersin, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Ambarlı |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Ambarlı or Mersin, then road to site. Air freight for samples and urgent quantities.
Questions from Istanbul projects
What makes office acoustics and soundproofing different in Istanbul?
Split units and VRF with condensers on facades and in light wells close to bedrooms. Seismic detailing means junctions that must stay flexible. An acoustic build-up cannot stiffen across a movement joint.
Where should the budget go first on a Istanbul project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Istanbul?
No. We manufacture in India and supply into Istanbul. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Istanbul site?
ships from: Palwal, Haryana, India, arrives at: Ambarlı or Mersin, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.