For projects in Ireland
Auditorium acoustics and soundproofing in Ireland
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Church buildings, parish halls and school halls carry speech and music in the same hard volume.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Ireland
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Church buildings, parish halls and school halls carry speech and music in the same hard volume.
Work reaching us from Ireland is mostly apartment schemes, plant and industrial buildings, offices, schools, clinics, studios.
- New build means decisions are still open Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Ireland.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Ireland, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Direct fix. Mechanically fixed to the soffit or wall. Durable and simple.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Ireland, church buildings, parish halls and school halls carry speech and music in the same hard volume.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Ireland, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
If you are specifying for a Ireland project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What we see driving Ireland briefs
- New build means decisions are still open
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale
The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise
Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Damp, mild climate
Our PET felt does not absorb moisture, shed fibre or feed mould, which matters on cold external walls and in sealed rooms.
- Assembly and performance rooms
Church buildings, parish halls and school halls carry speech and music in the same hard volume.
- School and campus buildings
School buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.
04 / Room by room
Space by space, for Ireland briefs
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Wood wool acoustic panels, 1200 x 600 mm
- Wooden slat acoustic panels, 13-3, 14-2, 28-4 and 59-5
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Wood wool acoustic panels, 20 mm
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

Rear wall
The single worst surface in most halls, and the first one to treat. Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Wood wool acoustic panels, 400 kg per cubic metre
- Wooden slat acoustic panels, 14, 16 and 18 mm
- Ceiling baffles and clouds, ASTM C423
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Conditions
Durability in Ireland, before acoustics is discussed
Ireland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Absorbing the whole room and losing the back rows
It sounds like a small detail until the room is finished and the complaint arrives.
-
Adding speakers to fix a reverberation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Ignoring the rear wall because it is behind the audience
This is the one that comes back as a second fit-out rather than a snag.
-
Treating it as a generic Ireland job
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
05 / Getting it there
What the route into Ireland actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dublin or Cork, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Dublin or Cork |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Dublin or Cork, then road to site. Air freight for samples and urgent quantities.
Questions from Ireland projects
What makes auditorium acoustics and soundproofing different in Ireland?
Church buildings, parish halls and school halls carry speech and music in the same hard volume. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
Where should the budget go first on a Ireland project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Ireland?
No. We manufacture in India and supply into Ireland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ireland site?
ships from: Palwal, Haryana, India, arrives at: Dublin or Cork, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.