For projects in Hong Kong
Venue and restaurant acoustics in Hong Kong
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Church buildings, halls and function rooms are compact hard volumes carrying amplified speech.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Hong Kong
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Church buildings, halls and function rooms are compact hard volumes carrying amplified speech.
Work reaching us from Hong Kong is mostly apartments, offices, hotels and dining, clinics, schools, studios.
- Depth is the expensive part Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
- Concrete towers, live rooms The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
- Plant on every roof and podium Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Hong Kong.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The build-up, layer by layer
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Hong Kong, central plant, split units and VRF packed into light wells and podium decks close to every flat.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Hong Kong, church buildings, halls and function rooms are compact hard volumes carrying amplified speech.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Hong Kong, school buildings are compact and hard surfaced with very intensive use and no spare volume.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / In this market
What we see driving Hong Kong briefs
- Depth is the expensive part
Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
- Concrete towers, live rooms
The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
- Plant on every roof and podium
Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
- The port is right here
Direct sea into Hong Kong keeps the chain short and the landed cost predictable.
- Assembly and performance rooms
Church buildings, halls and function rooms are compact hard volumes carrying amplified speech.
04 / Room by room
Room by room, on a typical Hong Kong job
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Durability
What the Hong Kong climate rules in and rules out
Hong Kong is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Read this first
Where this kind of project usually fails
-
Panels on the wall as a neighbour noise solution
This is the one that comes back as a second fit-out rather than a snag.
-
A lobby with both doors able to open at once
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Extract ducting that bypasses every wall you built
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Treating it as a generic Hong Kong job
Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
05 / Supply
How material reaches a Hong Kong site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Hong Kong, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Hong Kong |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Hong Kong, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Hong Kong projects
What makes venue and restaurant acoustics different in Hong Kong?
Church buildings, halls and function rooms are compact hard volumes carrying amplified speech. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
Where should the budget go first on a Hong Kong project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Hong Kong?
No. We manufacture in India and supply into Hong Kong. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Hong Kong site?
ships from: Palwal, Haryana, India, arrives at: Hong Kong, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.