Home > Hanoi > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Hanoi

Cinema and multiplex soundproofing in Hanoi

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in Hanoi

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

Work reaching us from Hanoi is mostly manufacturing plants, tube houses and apartments, offices, hotels, schools, clinics.

  • Narrow, deep buildings The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.
  • Continuous street noise Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.
  • New manufacturing at pace Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Hanoi.

Multiplex and cinema soundproofing

02 / The build-up

The stack, in the order it is installed

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Hanoi, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Hanoi, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Hanoi, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

For a Hanoi practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / Local conditions

What decides the build-up in Hanoi

  • Narrow, deep buildings

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Continuous street noise

    Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • New manufacturing at pace

    Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

  • Hot, humid, monsoon

    PET felt does not absorb moisture or feed mould, which matters where mineral products sag in a couple of seasons.

  • Assembly and performance rooms

    Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

04 / Room by room

What each space in a Hanoi project needs

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate and durability

Durability in Hanoi, before acoustics is discussed

Hanoi is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

On a Hanoi job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • A shared service void running across the wall line

    A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.

  • Treating the auditorium to fix bleed from the next screen

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Doors and lobbies specified late and undersized

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Hanoi job

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

05 / Getting it there

Supply into Hanoi, start to site

Supply into Hanoi
Ships fromPalwal, Haryana, India
Arrives atHaiphong, then road into Hanoi
Dispatch4 to 7 working days
FreightSea via Haiphong
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Haiphong, then road into Hanoi. Air freight for samples and urgent quantities.

FAQ

Questions from Hanoi projects

What makes cinema and multiplex soundproofing different in Hanoi?

Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

Where should the budget go first on a Hanoi project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Hanoi?

No. We manufacture in India and supply into Hanoi. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Hanoi site?

ships from: Palwal, Haryana, India, arrives at: Haiphong, then road into Hanoi, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.