HVAC, plant and machine noise control in Hanoi

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The material

What this is, and what it changes in a Hanoi room

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

Work reaching us from Hanoi is mostly manufacturing plants, tube houses and apartments, offices, hotels, schools, clinics.

  • Narrow, deep buildings The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.
  • Continuous street noise Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.
  • New manufacturing at pace Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Hanoi.

HVAC duct soundproofing Machine noise control

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Hanoi, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Hanoi, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Hanoi, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

If you are specifying for a Hanoi project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

What decides the build-up in Hanoi

  • Narrow, deep buildings

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Continuous street noise

    Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • New manufacturing at pace

    Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

  • Hot, humid, monsoon

    PET felt does not absorb moisture or feed mould, which matters where mineral products sag in a couple of seasons.

  • Plant and HVAC

    Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

04 / Room by room

Space by space, for Hanoi briefs

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate and durability

The Hanoi climate decides the material list

Hanoi is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

On a Hanoi job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

Where this kind of project usually fails

  • Absorption on the office wall for a plant room problem

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Hanoi job

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

05 / Supply

How material reaches a Hanoi site

Supply into Hanoi
Ships fromPalwal, Haryana, India
Arrives atHaiphong, then road into Hanoi
Dispatch4 to 7 working days
FreightSea via Haiphong
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Haiphong, then road into Hanoi. Air freight for samples and urgent quantities.

FAQ

Questions from Hanoi projects

What makes HVAC, plant and machine noise control different in Hanoi?

Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

Where should the budget go first on a Hanoi project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Hanoi?

No. We manufacture in India and supply into Hanoi. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Hanoi site?

ships from: Palwal, Haryana, India, arrives at: Haiphong, then road into Hanoi, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.