Home > Hanoi > Office acoustics and soundproofing

Modern office interior with acoustic treatment

For projects in Hanoi

Office acoustics and soundproofing in Hanoi

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this is, and what it changes in a Hanoi room

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

Work reaching us from Hanoi is mostly manufacturing plants, tube houses and apartments, offices, hotels, schools, clinics.

  • Narrow, deep buildings The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.
  • Continuous street noise Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.
  • New manufacturing at pace Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Hanoi.

Office and conference room acoustics Acoustic office screens

02 / The build-up

How the layers stack, from the structure inwards

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Hanoi, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Hanoi, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Hanoi, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / Local conditions

What the buildings in Hanoi do to the specification

  • Narrow, deep buildings

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Continuous street noise

    Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • New manufacturing at pace

    Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

  • Hot, humid, monsoon

    PET felt does not absorb moisture or feed mould, which matters where mineral products sag in a couple of seasons.

  • Plant and HVAC

    Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

04 / Room by room

Room by room, on a typical Hanoi job

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

What the Hanoi climate rules in and rules out

Hanoi is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

On a Hanoi job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Lining every wall while leaving the ceiling bare

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating a privacy problem with absorption

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Glass cabins specified without a door and head detail

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Hanoi job

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

05 / Getting it there

Supply into Hanoi, start to site

Supply into Hanoi
Ships fromPalwal, Haryana, India
Arrives atHaiphong, then road into Hanoi
Dispatch4 to 7 working days
FreightSea via Haiphong
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Haiphong, then road into Hanoi. Air freight for samples and urgent quantities.

FAQ

Questions from Hanoi projects

What makes office acoustics and soundproofing different in Hanoi?

Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

Where should the budget go first on a Hanoi project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in Hanoi?

No. We manufacture in India and supply into Hanoi. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Hanoi site?

ships from: Palwal, Haryana, India, arrives at: Haiphong, then road into Hanoi, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.