Home > Hanoi > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Hanoi

Auditorium acoustics and soundproofing in Hanoi

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / The product

What you are buying, and what it fixes in Hanoi

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

Work reaching us from Hanoi is mostly manufacturing plants, tube houses and apartments, offices, hotels, schools, clinics.

  • Narrow, deep buildings The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.
  • Continuous street noise Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.
  • New manufacturing at pace Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Hanoi.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The build-up, layer by layer

  1. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 1

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Hanoi, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Hanoi, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Hanoi, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

Architects working in Hanoi usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / What drives the brief

The Hanoi conditions that change the answer

  • Narrow, deep buildings

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Continuous street noise

    Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • New manufacturing at pace

    Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

  • Hot, humid, monsoon

    PET felt does not absorb moisture or feed mould, which matters where mineral products sag in a couple of seasons.

  • Assembly and performance rooms

    Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

  • School and campus buildings

    Classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

04 / Room by room

Where the money goes on a Hanoi project

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Traffic is relentless and close. It gets in through openings and glazing, so the facade path is where the money should go first.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Plants going up quickly on greenfield sites, where enclosure and partition detail can still be designed in.

For a Hanoi interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Conditions

Why the climate in Hanoi changes the material, not the target

Hanoi is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

On a Hanoi job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Straight talk

The six errors that cost the most

  • Absorbing the whole room and losing the back rows

    This is the one that comes back as a second fit-out rather than a snag.

  • Adding speakers to fix a reverberation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Ignoring the rear wall because it is behind the audience

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Hanoi job

    The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

05 / Supply

Getting it to Hanoi, with real dates

Supply into Hanoi
Ships fromPalwal, Haryana, India
Arrives atHaiphong, then road into Hanoi
Dispatch4 to 7 working days
FreightSea via Haiphong
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Haiphong, then road into Hanoi. Air freight for samples and urgent quantities.

FAQ

Questions from Hanoi projects

What makes auditorium acoustics and soundproofing different in Hanoi?

Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music. The classic tube house is long and narrow with party walls on both sides and an open front onto the street. Noise comes from the front and through both sides.

Where should the budget go first on a Hanoi project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Hanoi?

No. We manufacture in India and supply into Hanoi. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Hanoi site?

ships from: Palwal, Haryana, India, arrives at: Haiphong, then road into Hanoi, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.