Cinema and multiplex soundproofing in Georgia
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Church buildings and civic halls are stone volumes with very long decay times.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Georgia
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Church buildings and civic halls are stone volumes with very long decay times.
Work reaching us from Georgia is mostly coastal hotels, Tbilisi restoration and conversions, offices, restaurants, schools, clinics.
- Two markets, two answers New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- Soviet era panel housing Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- Seismic detailing Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Georgia.
02 / The build-up
What goes where, from the structure in
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Georgia, split units and central heating, with condensers in courtyards that reflect noise back.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Georgia, church buildings and civic halls are stone volumes with very long decay times.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Georgia, school buildings are hard surfaced with long corridors and halls that carry assembly and sport.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
If you are specifying for a Georgia project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / Local conditions
What decides the build-up in Georgia
- Two markets, two answers
New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- Soviet era panel housing
Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- Seismic detailing
Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- Black Sea ports are close to the market
Poti and Batumi are both a short run from the main centres, which keeps the inland cost low.
- Assembly and performance rooms
Church buildings and civic halls are stone volumes with very long decay times.
04 / Room by room
Room by room, on a typical Georgia job
-

Screen to screen
Independent construction between auditoria, with services broken at the line. New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic carpet and rugs, 4 mm
- PET felt acoustic panels, 4 to 24 mm
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic carpet and rugs, High density polyester
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
-

Plant and projection
Equipment noise into the auditorium, treated at source. Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic carpet and rugs, Felt
- PET felt acoustic panels, 2440 x 4270 mm, 2.44 x 4.27 m, 8 x 14 ft
For a Georgia interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Durability in Georgia, before acoustics is discussed
Georgia is mild summers and cold, wet winters, and that narrows the material list before acoustics is discussed.
Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.
The failure we design against here is condensation and cold bridging behind new linings.
Where a consultant is already engaged on a Georgia project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
A shared service void running across the wall line
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Georgia job
New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
05 / Supply
Getting it to Georgia, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Poti or Batumi, then road inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Poti or Batumi |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Poti or Batumi, then road inland. Air freight for samples and urgent quantities.
Questions from Georgia projects
What makes cinema and multiplex soundproofing different in Georgia?
Church buildings and civic halls are stone volumes with very long decay times. New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
Where should the budget go first on a Georgia project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Georgia?
No. We manufacture in India and supply into Georgia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Georgia site?
ships from: Palwal, Haryana, India, arrives at: Poti or Batumi, then road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up