Manufactured in India, supplied in Georgia
Acoustic carpet and rugs in Georgia
We manufacture acoustic carpet and rugs at our own plant at Palwal in Haryana, India, and supply them into Georgia. Made at our own plant in India and shipped into Poti or Batumi on the Black Sea, then a short road run inland.
- Tile size
- 500 x 500 mm
- Thickness
- 4 mm
- Face
- High density polyester
- Backing
- Felt
- Pack coverage
- 64 sq ft per pack
- Lead time
- 4 to 7 working days
- Minimum order
- From 320 sq ft
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
- Test reports sent on request, not just quoted
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The material
What you are buying, and what it fixes in Georgia
A tile carpet with a dense polyester face on a felt backing. It absorbs at the floor and, more usefully, kills footfall and chair scrape at the point they are generated.
Work reaching us from Georgia is mostly coastal hotels, Tbilisi restoration and conversions, offices, restaurants, schools, clinics.
Soviet era blocks and older masonry buildings with timber floors, plus new concrete towers with hard finishes.
- Loose lay on tackifier Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
- Over a resilient underlay Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
- Zoned Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
- What it will not do Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for acoustic carpet and rugs are on the main product page. This page covers what that means for a project in Georgia.
02 / The numbers
Published specification, identical wherever we ship it
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Standard tile4 mm. Offices, classrooms, studios, corridors
| Tile size | 500 x 500 mm |
|---|---|
| Thickness | 4 mm |
| Face | High density polyester |
| Backing | Felt |
| Pack coverage | 64 sq ft per pack |
| Boxed | 20 kg, 55 x 55 x 15 cm |
Where a consultant is already engaged on a Georgia project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / Local conditions
What the buildings in Georgia do to the specification
- Two markets, two answers
New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- Soviet era panel housing
Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- Seismic detailing
Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- Black Sea ports are close to the market
Poti and Batumi are both a short run from the main centres, which keeps the inland cost low.
- Assembly and performance rooms
Church buildings and civic halls are stone volumes with very long decay times.
- The housing stock
Soviet era blocks and older masonry buildings with timber floors, plus new concrete towers with hard finishes.
For a Georgia practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
04 / Conditions
What the Georgia climate rules in and rules out
Georgia is mild summers and cold, wet winters, and that narrows the sensible material list before acoustics is even discussed.
Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.
The risk we design against here is condensation and cold bridging behind new linings.
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
05 / Logistics
What the route into Georgia actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Poti or Batumi, then road inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Poti or Batumi |
| Packing | Boxed, 64 sq ft per pack, 20 kg. Easy to carry up a stair, which matters on fit-out sites with no lift access. |
| Lead time | 4 to 7 working days. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Poti or Batumi, then road inland. Air freight for samples and urgent quantities.
The same minimums apply on export.
| Carpet tiles | 320 sq ft, about 30 sq m |
|---|---|
| Rugs | 500 sq ft, about 46 sq m |
A pack of tiles covers 64 sq ft and weighs 20 kg boxed, so the tile minimum is exactly five packs and about 100 kg.
06 / Worth knowing
Four honest warnings before you buy
-
The wrong product for the problem
Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Local approvals that nobody actually holds
We hold no Georgia certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
Georgia: questions we are actually asked
Do you manufacture acoustic carpet and rugs in Georgia?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Georgia as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Poti or Batumi on the Black Sea, then a short road run inland. You buy at factory prices with one consistent batch across the order.
What do you look at first on a Georgia enquiry?
New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work. Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment. Those two things move the build-up far more than the panel figure does.
Will this material last in the Georgia climate?
Georgia is mild summers and cold, wet winters. Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air. The failure we design against here is condensation and cold bridging behind new linings.
When would material land on a Georgia site?
ships from: Palwal, Haryana, India, arrives at: Poti or Batumi, then road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What should you not buy acoustic carpet and rugs for?
Carpet fixes footfall and chair noise and takes the edge off a live room. It will not deliver a reverberation target on its own, because the ceiling is almost always the bigger surface.
What quantity do we have to order, and in what packaging?
The same minimums apply on export. Carpet tiles, 320 sq ft, about 30 sq m. Rugs, 500 sq ft, about 46 sq m. A pack of tiles covers 64 sq ft and weighs 20 kg boxed, so the tile minimum is exactly five packs and about 100 kg. Boxed, 64 sq ft per pack, 20 kg. Easy to carry up a stair, which matters on fit-out sites with no lift access.
Next step
Send a plan and a section, get a real build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.