For projects in Georgia
Recording studio acoustics and soundproofing in Georgia
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A growing film and music sector using converted buildings with good mass and hard surfaces.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Georgia
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
A growing film and music sector using converted buildings with good mass and hard surfaces.
Work reaching us from Georgia is mostly coastal hotels, Tbilisi restoration and conversions, offices, restaurants, schools, clinics.
- Two markets, two answers New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- Soviet era panel housing Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- Seismic detailing Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Georgia.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Georgia, split units and central heating, with condensers in courtyards that reflect noise back.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Georgia, church buildings and civic halls are stone volumes with very long decay times.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
Soundproof curtains
A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Georgia, school buildings are hard surfaced with long corridors and halls that carry assembly and sport.
Track with a seal. Ceiling track plus a floor seal or drape, so the perimeter is closed when it is drawn.
For a Georgia practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What the buildings in Georgia do to the specification
- Two markets, two answers
New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- Soviet era panel housing
Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- Seismic detailing
Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- Black Sea ports are close to the market
Poti and Batumi are both a short run from the main centres, which keeps the inland cost low.
- The housing stock
Soviet era blocks and older masonry buildings with timber floors, plus new concrete towers with hard finishes.
- The studio and content scene
A growing film and music sector using converted buildings with good mass and hard surfaces.
04 / Room by room
Where the money goes on a Georgia project
-

Isolation
A measured background level, agreed before anything is bought. New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Soundproof curtains, 5.5 kg per sq m
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. Prefabricated blocks pass speech and footfall between flats through thin connected elements. Mass and decoupling, not surface treatment.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Soundproof curtains, Up to 30 dB
-

Early reflections
Controlled at the mix position, and only there. Movement joints have to stay free, so an acoustic layer must not stiffen across them.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Soundproof curtains, 30
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Durability
The Georgia climate decides the material list
Georgia is mild summers and cold, wet winters, and that narrows the material list before acoustics is discussed.
Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.
The failure we design against here is condensation and cold bridging behind new linings.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Before you buy
The six errors that cost the most
-
Buying foam to solve an isolation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Treating the room before the shell is isolated
This is the one that comes back as a second fit-out rather than a snag.
-
Killing the room completely and calling it controlled
More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.
-
Treating it as a generic Georgia job
New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
05 / Getting it there
Supply into Georgia, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Poti or Batumi, then road inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Poti or Batumi |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Poti or Batumi, then road inland. Air freight for samples and urgent quantities.
Questions from Georgia projects
What makes recording studio acoustics and soundproofing different in Georgia?
A growing film and music sector using converted buildings with good mass and hard surfaces. New coastal hotels are built and can be designed properly. Tbilisi conversions keep the original structure and need shallow internal work.
Where should the budget go first on a Georgia project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Georgia?
No. We manufacture in India and supply into Georgia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Georgia site?
ships from: Palwal, Haryana, India, arrives at: Poti or Batumi, then road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.