Home > Cuba > Office acoustics and soundproofing

Modern office interior with acoustic treatment

For projects in Cuba

Office acoustics and soundproofing in Cuba

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units and generator sets where available, with plant close to occupied rooms.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this material is and where it earns its place in Cuba

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

Split units and generator sets where available, with plant close to occupied rooms.

Work reaching us from Cuba is mostly hotels and restoration projects, theatres and halls, offices, clinics, schools.

  • Paperwork is part of the lead time Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.
  • Heritage buildings under restoration Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.
  • Salt air and humidity PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Cuba.

Office and conference room acoustics Acoustic office screens

02 / The build-up

What goes where, from the structure in

  1. Acoustic hanging ceiling baffles in a large open space

    Layer 1

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Cuba, split units and generator sets where available, with plant close to occupied rooms.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Cuba, theatres, church buildings and cultural centres are masonry volumes with very long decay.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Cuba, classrooms are hard and naturally ventilated with high ceilings and open circulation.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

Architects working in Cuba usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

The Cuba conditions that change the answer

  • Paperwork is part of the lead time

    Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

  • Heritage buildings under restoration

    Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.

  • Salt air and humidity

    PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.

  • Theatres and assembly halls

    Large historic rooms where speech intelligibility fails long before anyone calls the room echoey.

  • Plant and HVAC

    Split units and generator sets where available, with plant close to occupied rooms.

04 / Room by room

Space by space, for Cuba briefs

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate and durability

Durability in Cuba, before acoustics is discussed

Cuba is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a Cuba job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Lining every wall while leaving the ceiling bare

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating a privacy problem with absorption

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Glass cabins specified without a door and head detail

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating it as a generic Cuba job

    Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

05 / Getting it there

Supply into Cuba, start to site

Supply into Cuba
Ships fromPalwal, Haryana, India
Arrives atMariel, then road to site
Dispatch4 to 7 working days
FreightSea via Mariel
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Mariel, then road to site. Air freight for samples where it is practical.

FAQ

Questions from Cuba projects

What makes office acoustics and soundproofing different in Cuba?

Split units and generator sets where available, with plant close to occupied rooms. Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

Where should the budget go first on a Cuba project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in Cuba?

No. We manufacture in India and supply into Cuba. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Cuba site?

ships from: Palwal, Haryana, India, arrives at: Mariel, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.