Home > Cuba > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Cuba

HVAC, plant and machine noise control in Cuba

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and generator sets where available, with plant close to occupied rooms.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in Cuba

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units and generator sets where available, with plant close to occupied rooms.

Work reaching us from Cuba is mostly hotels and restoration projects, theatres and halls, offices, clinics, schools.

  • Paperwork is part of the lead time Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.
  • Heritage buildings under restoration Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.
  • Salt air and humidity PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Cuba.

HVAC duct soundproofing Machine noise control

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Cuba, split units and generator sets where available, with plant close to occupied rooms.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Cuba, theatres, church buildings and cultural centres are masonry volumes with very long decay.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

  3. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 3

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Cuba, classrooms are hard and naturally ventilated with high ceilings and open circulation.

    On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.

If you are specifying for a Cuba project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

What the buildings in Cuba do to the specification

  • Paperwork is part of the lead time

    Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

  • Heritage buildings under restoration

    Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.

  • Salt air and humidity

    PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.

  • Theatres and assembly halls

    Large historic rooms where speech intelligibility fails long before anyone calls the room echoey.

  • Plant and HVAC

    Split units and generator sets where available, with plant close to occupied rooms.

04 / Room by room

Room by room, on a typical Cuba job

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate

Durability in Cuba, before acoustics is discussed

Cuba is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a Cuba job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

What we watch go wrong on jobs like this

  • Absorption on the office wall for a plant room problem

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Ignoring structure borne vibration through the mounts

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Cuba job

    Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

05 / Route to site

What the route into Cuba actually looks like

Supply into Cuba
Ships fromPalwal, Haryana, India
Arrives atMariel, then road to site
Dispatch4 to 7 working days
FreightSea via Mariel
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Mariel, then road to site. Air freight for samples where it is practical.

FAQ

Questions from Cuba projects

What makes HVAC, plant and machine noise control different in Cuba?

Split units and generator sets where available, with plant close to occupied rooms. Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

Where should the budget go first on a Cuba project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Cuba?

No. We manufacture in India and supply into Cuba. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Cuba site?

ships from: Palwal, Haryana, India, arrives at: Mariel, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.