Manufactured in India, supplied in Cuba
Soundproofing materials in Cuba
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Cuba. Made at our own plant in India and shipped into Mariel.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The material
What this material is and where it earns its place in Cuba
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Cuba is mostly hotels and restoration projects, theatres and halls, offices, clinics, schools.
Older masonry and concrete construction with hard floors, in buildings that share walls and courtyards.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Cuba.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
Published specification, identical wherever we ship it
Nothing below changes by location. The decisions that do change are grade, thickness and how the material is mounted, and those are covered further down.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Where a consultant is already engaged on a Cuba project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
03 / In this market
What decides the build-up in Cuba
- Heritage buildings under restoration
Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.
- Paperwork is part of the lead time
Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.
- Salt air and humidity
PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.
- Theatres and assembly halls
Large historic rooms where speech intelligibility fails long before anyone calls the room echoey.
- Plant and HVAC
Split units and generator sets where available, with plant close to occupied rooms.
- The housing stock
Older masonry and concrete construction with hard floors, in buildings that share walls and courtyards.
Architects working in Cuba usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Climate
What the Cuba climate rules in and rules out
Cuba is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Supply
What the route into Cuba actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Mariel, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Mariel |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Mariel, then road to site. Air freight for samples where it is practical.
06 / Worth knowing
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
A claim of being local to Cuba
We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.
07 / In projects
The product on finished jobs
Cuba: questions we are actually asked
Do you manufacture soundproofing materials in Cuba?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Cuba as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Mariel. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Cuba job?
Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window. Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow. Those two things move the build-up far more than the panel figure does.
Does Cuba weather shorten the life of this material?
Cuba is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
How does an order actually travel to Cuba?
ships from: Palwal, Haryana, India, arrives at: Mariel, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Where do soundproofing materials fail to help?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.