Home > Cuba > Hospital and healthcare acoustics

Hospital corridor with acoustic ceiling and wall treatment

For projects in Cuba

Hospital and healthcare acoustics in Cuba

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Split units and generator sets where available, with plant close to occupied rooms.

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work.
Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime.
Quote
From a plan and a section, within 48 hours

01 / The product

What this is, and what it changes in a Cuba room

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.

Split units and generator sets where available, with plant close to occupied rooms.

Work reaching us from Cuba is mostly hotels and restoration projects, theatres and halls, offices, clinics, schools.

  • Paperwork is part of the lead time Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.
  • Heritage buildings under restoration Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.
  • Salt air and humidity PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.
  • Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Cuba.

Hospital soundproofing

02 / The build-up

The build-up, layer by layer

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Cuba, split units and generator sets where available, with plant close to occupied rooms.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Cuba, theatres, church buildings and cultural centres are masonry volumes with very long decay.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Cuba, classrooms are hard and naturally ventilated with high ceilings and open circulation.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

For a Cuba practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / On the ground

What decides the build-up in Cuba

  • Paperwork is part of the lead time

    Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

  • Heritage buildings under restoration

    Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.

  • Salt air and humidity

    PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.

  • Theatres and assembly halls

    Large historic rooms where speech intelligibility fails long before anyone calls the room echoey.

  • Plant and HVAC

    Split units and generator sets where available, with plant close to occupied rooms.

04 / Room by room

Space by space, for Cuba briefs

  • Hospital consultation room with acoustic wall treatment

    Consulting room privacy

    Speech privacy between rooms, which is partition, door and ceiling void work. Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

  • Hospital corridor with acoustic ceiling baffles and clouds

    Ward noise floor

    Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Tall rooms with hard plaster and timber floors, where the structure stays and everything has to be done internally and shallow.

  • Hospital corridor doors with acoustic seals and curtains

    Cleanability

    Non shedding, non absorbent surfaces that survive a cleaning regime. PET felt does not absorb moisture, rot or feed mould, which matters on a Caribbean coast where mineral products fail quickly.

For a Cuba interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

The Cuba climate decides the material list

Cuba is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

Where a consultant is already engaged on a Cuba project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

Where this kind of project usually fails

  • Fabric wrapped products in a clinical area

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Absorption used where privacy was the requirement

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Ceiling void left open above a partition

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating it as a generic Cuba job

    Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

05 / Getting it there

Supply into Cuba, start to site

Supply into Cuba
Ships fromPalwal, Haryana, India
Arrives atMariel, then road to site
Dispatch4 to 7 working days
FreightSea via Mariel
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Mariel, then road to site. Air freight for samples where it is practical.

FAQ

Questions from Cuba projects

What makes hospital and healthcare acoustics different in Cuba?

Split units and generator sets where available, with plant close to occupied rooms. Import formalities take real time here. We prepare the documentation package before shipping rather than after, and we quote the full window.

Where should the budget go first on a Cuba project?

Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.

Do you have an office or installation team in Cuba?

No. We manufacture in India and supply into Cuba. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Cuba site?

ships from: Palwal, Haryana, India, arrives at: Mariel, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.

script src="/assets/vendor/glightbox/js/glightbox.min.js">