For projects in Chile
Venue and restaurant acoustics in Chile
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Church buildings, theatres and event halls are hard volumes with long decay times.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Chile job
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Church buildings, theatres and event halls are hard volumes with long decay times.
Work reaching us from Chile is mostly offices, apartments, mining and industrial facilities, hotels, hospitals, schools.
- Seismic detailing comes first Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
- Mining and industrial plant Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.
- A very long country Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Chile.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Chile, split units and central plant with condensers on facades and rooftops close to bedrooms.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Chile, church buildings, theatres and event halls are hard volumes with long decay times.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Chile, school buildings are hard surfaced with long corridors and gymnasiums doubling as assembly halls.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
If you are specifying for a Chile project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / On the ground
The Chile conditions that change the answer
- Seismic detailing comes first
Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
- Mining and industrial plant
Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.
- A very long country
Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.
- Dry in the north, wet in the south
PET felt is stable in both. It does not absorb moisture or degrade in dry heat, which simplifies specifying across regions.
- Assembly and performance rooms
Church buildings, theatres and event halls are hard volumes with long decay times.
04 / Room by room
What each space in a Chile project needs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Wooden slat acoustic panels, 13-3, 14-2, 28-4 and 59-5
- Acoustic carpet and rugs, High density polyester
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
- Acoustic carpet and rugs, Felt
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Wooden slat acoustic panels, 14, 16 and 18 mm
- Acoustic carpet and rugs, 64 sq ft per pack
For a Chile interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Durability
What the Chile climate rules in and rules out
Chile is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
On a Chile job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Straight talk
Six mistakes that turn into a second fit-out
-
Panels on the wall as a neighbour noise solution
Small on the drawing, expensive on site, and almost always found after handover.
-
A lobby with both doors able to open at once
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Chile job
Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
05 / Route to site
Getting it to Chile, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | San Antonio or Valparaíso, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via San Antonio |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into San Antonio or Valparaíso, then road to site. Air freight for samples and urgent quantities.
Questions from Chile projects
What makes venue and restaurant acoustics different in Chile?
Church buildings, theatres and event halls are hard volumes with long decay times. Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
Where should the budget go first on a Chile project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Chile?
No. We manufacture in India and supply into Chile. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Chile site?
ships from: Palwal, Haryana, India, arrives at: San Antonio or Valparaíso, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.