Home > Chile > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Chile

Recording studio acoustics and soundproofing in Chile

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A growing music and content sector working inside apartment blocks and commercial floors.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / The material

What this is, and what it changes in a Chile room

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A growing music and content sector working inside apartment blocks and commercial floors.

Work reaching us from Chile is mostly offices, apartments, mining and industrial facilities, hotels, hospitals, schools.

  • Seismic detailing comes first Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
  • Mining and industrial plant Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.
  • A very long country Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Chile.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

The build-up, layer by layer

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Chile, split units and central plant with condensers on facades and rooftops close to bedrooms.

    First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Chile, church buildings, theatres and event halls are hard volumes with long decay times.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Chile, school buildings are hard surfaced with long corridors and gymnasiums doubling as assembly halls.

    Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.

If you are specifying for a Chile project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / On the ground

What we see driving Chile briefs

  • Seismic detailing comes first

    Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

  • Mining and industrial plant

    Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.

  • A very long country

    Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.

  • Dry in the north, wet in the south

    PET felt is stable in both. It does not absorb moisture or degrade in dry heat, which simplifies specifying across regions.

  • The housing stock

    Concrete and block construction with hard floors, in apartment towers sharing slabs, built to seismic detailing that adds mass.

  • The studio and content scene

    A growing music and content sector working inside apartment blocks and commercial floors.

04 / Room by room

Where the money goes on a Chile project

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate and durability

What the Chile climate rules in and rules out

Chile is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a Chile job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Before you buy

Six mistakes that turn into a second fit-out

  • Buying foam to solve an isolation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating the room before the shell is isolated

    This is the one that comes back as a second fit-out rather than a snag.

  • Killing the room completely and calling it controlled

    A room can be over-treated. Past the target it stops sounding controlled and starts sounding dead, and you paid for that.

  • Treating it as a generic Chile job

    Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

05 / Logistics

What the route into Chile actually looks like

Supply into Chile
Ships fromPalwal, Haryana, India
Arrives atSan Antonio or Valparaíso, then road to site
Dispatch4 to 7 working days
FreightSea via San Antonio
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into San Antonio or Valparaíso, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Chile projects

What makes recording studio acoustics and soundproofing different in Chile?

A growing music and content sector working inside apartment blocks and commercial floors. Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.

Where should the budget go first on a Chile project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Chile?

No. We manufacture in India and supply into Chile. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Chile site?

ships from: Palwal, Haryana, India, arrives at: San Antonio or Valparaíso, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.