Manufactured in India, supplied in Chile
Soundproofing materials in Chile
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Chile. Made at our own plant in India and shipped into San Antonio or Valparaíso, then road along a very long country.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / The product
What you are buying, and what it fixes in Chile
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Chile is mostly offices, apartments, mining and industrial facilities, hotels, hospitals, schools.
Concrete and block construction with hard floors, in apartment towers sharing slabs, built to seismic detailing that adds mass.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Chile.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
Published specification, identical wherever we ship it
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / On the ground
The Chile conditions that change the answer
- Seismic detailing comes first
Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it.
- Mining and industrial plant
Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work.
- A very long country
Site location changes the inland leg dramatically. We quote the road leg for your actual destination rather than an average.
- Dry in the north, wet in the south
PET felt is stable in both. It does not absorb moisture or degrade in dry heat, which simplifies specifying across regions.
- Plant and HVAC
Split units and central plant with condensers on facades and rooftops close to bedrooms.
- The housing stock
Concrete and block construction with hard floors, in apartment towers sharing slabs, built to seismic detailing that adds mass.
Architects working in Chile usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Climate and durability
Durability in Chile, before acoustics is discussed
Chile is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Getting it there
Supply into Chile, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | San Antonio or Valparaíso, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via San Antonio |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into San Antonio or Valparaíso, then road to site. Air freight for samples and urgent quantities.
06 / Read this first
What we will tell you that a reseller will not
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
Local approvals that nobody actually holds
We hold no Chile certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
07 / In projects
The material in real interiors
Chile: questions we are actually asked
Where are the soundproofing materials you supply to Chile actually made?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Chile as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into San Antonio or Valparaíso, then road along a very long country. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Chile project?
Movement joints have to stay free. An acoustic layer must respect the structural design rather than stiffen across it. Remote facilities with continuous machinery and control rooms where alarms have to be understood. Enclosure and mass do that work. Those two things move the build-up far more than the panel figure does.
How does the Chile climate affect this product?
Chile is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
How quickly can material reach a site in Chile?
ships from: Palwal, Haryana, India, arrives at: San Antonio or Valparaíso, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.