Home > Chicago > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Chicago

Auditorium acoustics and soundproofing in Chicago

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / Start here

What you are buying, and what it fixes in Chicago

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

Work reaching us from Chicago is mostly two-flats and three-flats, high-rise apartments, offices, venues, schools, clinics.

  • Elevated rail past the window Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.
  • Brick outside, timber inside Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.
  • Sealed against hard winters Buildings close up for months and mechanical systems run hard, so sound accumulates inside rather than escaping.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Chicago.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

What goes where, from the structure in

  1. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 1

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Chicago, packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

    Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Chicago, churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Chicago, public school buildings run long corridors with hard floors and lay-in tile ceilings that were chosen for cost, not for speech. Classroom reverberation and corridor spill are the two complaints, and both respond to ceiling area rather than wall panels.

    Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.

For a Chicago practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / In this market

What the buildings in Chicago do to the specification

  • Elevated rail past the window

    Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

  • Brick outside, timber inside

    Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.

  • Sealed against hard winters

    Buildings close up for months and mechanical systems run hard, so sound accumulates inside rather than escaping.

  • No port, so plan the inland leg

    Everything arrives at a coast and rails in. We quote the sea leg and the inland leg separately.

  • Assembly and performance rooms

    Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

  • School and campus buildings

    Public school buildings run long corridors with hard floors and lay-in tile ceilings that were chosen for cost, not for speech. Classroom reverberation and corridor spill are the two complaints, and both respond to ceiling area rather than wall panels.

04 / Room by room

Where the money goes on a Chicago project

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Two-flats and three-flats have solid masonry outside and timber floors between families. Footfall travels down and masonry does nothing about it.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Buildings close up for months and mechanical systems run hard, so sound accumulates inside rather than escaping.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate

Why the climate in Chicago changes the material, not the target

Chicago is mild summers and cold, wet winters, and that narrows the material list before acoustics is discussed.

Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.

The failure we design against here is condensation and cold bridging behind new linings.

Where a consultant is already engaged on a Chicago project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • Absorbing the whole room and losing the back rows

    Small on the drawing, expensive on site, and almost always found after handover.

  • Adding speakers to fix a reverberation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Ignoring the rear wall because it is behind the audience

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Chicago job

    Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

05 / Getting it there

Supply into Chicago, start to site

Supply into Chicago
Ships fromPalwal, Haryana, India
Arrives atAn East or Gulf coast port, then rail and road inland
Dispatch4 to 7 working days
FreightSea, then rail inland
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into an East or Gulf coast port, then rail and road to Chicago. Air freight for samples and urgent quantities.

FAQ

Questions from Chicago projects

What makes auditorium acoustics and soundproofing different in Chicago?

Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both. Trains at window height put noise in through the glazing, not through the wall. The facade is where the money should go first.

Where should the budget go first on a Chicago project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Chicago?

No. We manufacture in India and supply into Chicago. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Chicago site?

ships from: Palwal, Haryana, India, arrives at: An East or Gulf coast port, then rail and road inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.