For projects in Cambodia
Venue and restaurant acoustics in Cambodia
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Temples, function halls and conference rooms are hard volumes carrying amplified speech.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this material is and where it earns its place in Cambodia
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Temples, function halls and conference rooms are hard volumes carrying amplified speech.
Work reaching us from Cambodia is mostly garment and manufacturing units, hotels, offices, schools, hospitals, restaurants.
- Hospitality in heritage towns Hotel work where guest room isolation and function room acoustics are the recurring briefs.
- Generators are part of the building Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
- Garment floors at scale Large production halls with continuous machine noise and rooms where instructions and alarms must be understood.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Cambodia.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Cambodia, split units with condensers on facades and in narrow gaps between buildings.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Cambodia, temples, function halls and conference rooms are hard volumes carrying amplified speech.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Cambodia, classrooms are hard and naturally ventilated, open to street and corridor noise.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
Architects working in Cambodia usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / Local conditions
The Cambodia conditions that change the answer
- Hospitality in heritage towns
Hotel work where guest room isolation and function room acoustics are the recurring briefs.
- Generators are part of the building
Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
- Garment floors at scale
Large production halls with continuous machine noise and rooms where instructions and alarms must be understood.
- Tropical humidity
PET felt does not hold moisture or feed mould, which decides whether a ceiling survives more than a couple of seasons.
- Assembly and performance rooms
Temples, function halls and conference rooms are hard volumes carrying amplified speech.
04 / Room by room
Room by room, on a typical Cambodia job
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Hotel work where guest room isolation and function room acoustics are the recurring briefs.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Wooden slat acoustic panels, 14, 16 and 18 mm
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Large production halls with continuous machine noise and rooms where instructions and alarms must be understood.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Wooden slat acoustic panels, 96 sq ft per unit
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Durability
What the Cambodia climate rules in and rules out
Cambodia is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
Panels on the wall as a neighbour noise solution
It sounds like a small detail until the room is finished and the complaint arrives.
-
A lobby with both doors able to open at once
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Cambodia job
Hotel work where guest room isolation and function room acoustics are the recurring briefs.
05 / Route to site
How material reaches a Cambodia site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Sihanoukville, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Sihanoukville |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Sihanoukville, then road to site. Air freight for samples and urgent quantities.
Questions from Cambodia projects
What makes venue and restaurant acoustics different in Cambodia?
Temples, function halls and conference rooms are hard volumes carrying amplified speech. Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
Where should the budget go first on a Cambodia project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Cambodia?
No. We manufacture in India and supply into Cambodia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Cambodia site?
ships from: Palwal, Haryana, India, arrives at: Sihanoukville, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.