Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A small but growing content sector working inside shophouses and commercial floors.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Cambodia
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
A small but growing content sector working inside shophouses and commercial floors.
Work reaching us from Cambodia is mostly garment and manufacturing units, hotels, offices, schools, hospitals, restaurants.
- Generators are part of the building Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
- Garment floors at scale Large production halls with continuous machine noise and rooms where instructions and alarms must be understood.
- Tropical humidity PET felt does not hold moisture or feed mould, which decides whether a ceiling survives more than a couple of seasons.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Cambodia.
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Cambodia, split units with condensers on facades and in narrow gaps between buildings.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Cambodia, temples, function halls and conference rooms are hard volumes carrying amplified speech.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Cambodia, classrooms are hard and naturally ventilated, open to street and corridor noise.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
For a Cambodia practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / On the ground
What we see driving Cambodia briefs
- Generators are part of the building
Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
- Garment floors at scale
Large production halls with continuous machine noise and rooms where instructions and alarms must be understood.
- Tropical humidity
PET felt does not hold moisture or feed mould, which decides whether a ceiling survives more than a couple of seasons.
- Hospitality in heritage towns
Hotel work where guest room isolation and function room acoustics are the recurring briefs.
- The housing stock
Concrete frame with block infill, shophouses and new condominium towers, all with hard floors and shared walls.
- The studio and content scene
A small but growing content sector working inside shophouses and commercial floors.
04 / Room by room
What each space in a Cambodia project needs
-

Isolation
A measured background level, agreed before anything is bought. Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Soundproof curtains, 5.5 kg per sq m
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. Large production halls with continuous machine noise and rooms where instructions and alarms must be understood.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Soundproof curtains, Up to 30 dB
-

Early reflections
Controlled at the mix position, and only there. PET felt does not hold moisture or feed mould, which decides whether a ceiling survives more than a couple of seasons.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Soundproof curtains, 30
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
Why the climate in Cambodia changes the material, not the target
Cambodia is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Where a consultant is already engaged on a Cambodia project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Straight talk
What we watch go wrong on jobs like this
-
Buying foam to solve an isolation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Treating the room before the shell is isolated
This is the one that comes back as a second fit-out rather than a snag.
-
Killing the room completely and calling it controlled
We would rather calculate the area and sell you less of it than line every surface and call it thorough.
-
Treating it as a generic Cambodia job
Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
05 / Route to site
Supply into Cambodia, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Sihanoukville, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Sihanoukville |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Sihanoukville, then road to site. Air freight for samples and urgent quantities.
Questions from Cambodia projects
What makes recording studio acoustics and soundproofing different in Cambodia?
A small but growing content sector working inside shophouses and commercial floors. Standby generation runs often enough to be a permanent condition and sits close to occupied space. Enclosure at the source is the only real fix.
Where should the budget go first on a Cambodia project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Cambodia?
No. We manufacture in India and supply into Cambodia. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Cambodia site?
ships from: Palwal, Haryana, India, arrives at: Sihanoukville, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.