For projects in Calgary
Office acoustics and soundproofing in Calgary
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
The material, and what it actually does on a Calgary job
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.
Work reaching us from Calgary is mostly corporate offices and operations centres, condo towers, schools, clinics, home theatres.
- A long way inland Vancouver then rail across the mountains. It is a real leg with real time attached, and we build it into the date rather than quoting a port arrival.
- Light frame residential Condo and house construction is gypsum on studs, which passes low frequency far more easily than concrete. Added mass and decoupling do the work.
- Operations centres run all day Rooms where people monitor, take calls and talk over each other for twelve hours need intelligibility and privacy together, not just less echo.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Calgary.
Office and conference room acoustics Acoustic office screens
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Calgary, forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.
Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Calgary, community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Calgary, school buildings run hard floors and lay-in tile with long heating seasons and sealed envelopes, so rooms stay live and mechanical noise is always present.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
For a Calgary practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / On the ground
What the buildings in Calgary do to the specification
- A long way inland
Vancouver then rail across the mountains. It is a real leg with real time attached, and we build it into the date rather than quoting a port arrival.
- Light frame residential
Condo and house construction is gypsum on studs, which passes low frequency far more easily than concrete. Added mass and decoupling do the work.
- Operations centres run all day
Rooms where people monitor, take calls and talk over each other for twelve hours need intelligibility and privacy together, not just less echo.
- Sealed against deep cold
Buildings close up for months and mechanical systems work hard. Sound stops leaking out and starts building up, so absorption has to be balanced rather than maximised.
- Plant and HVAC
Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.
04 / Room by room
Space by space, for Calgary briefs
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Vancouver then rail across the mountains. It is a real leg with real time attached, and we build it into the date rather than quoting a port arrival.
- Ceiling baffles and clouds, 100% PET non-woven, the panel family
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic carpet and rugs, High density polyester
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. Condo and house construction is gypsum on studs, which passes low frequency far more easily than concrete. Added mass and decoupling do the work.
- Ceiling baffles and clouds, 9 to 24 mm
- PET felt acoustic panels, 4 to 24 mm
- Acoustic carpet and rugs, Felt
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Rooms where people monitor, take calls and talk over each other for twelve hours need intelligibility and privacy together, not just less echo.
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
- Acoustic carpet and rugs, 64 sq ft per pack
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate
What the Calgary climate rules in and rules out
Calgary is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
Where this kind of project usually fails
-
Lining every wall while leaving the ceiling bare
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating a privacy problem with absorption
Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.
-
Glass cabins specified without a door and head detail
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Calgary job
Vancouver then rail across the mountains. It is a real leg with real time attached, and we build it into the date rather than quoting a port arrival.
05 / Route to site
What the route into Calgary actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Vancouver, then rail and road to Calgary |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Vancouver, then rail |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Add the sea leg to Vancouver and the rail leg inland, and plan the full window. We quote both parts separately.
Sea freight into Vancouver, then rail and road to Calgary. Air freight for samples and urgent quantities.
Questions from Calgary projects
What makes office acoustics and soundproofing different in Calgary?
Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do. Vancouver then rail across the mountains. It is a real leg with real time attached, and we build it into the date rather than quoting a port arrival.
Where should the budget go first on a Calgary project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Calgary?
No. We manufacture in India and supply into Calgary. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Calgary site?
ships from: Palwal, Haryana, India, arrives at: Vancouver, then rail and road to Calgary, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Add the sea leg to Vancouver and the rail leg inland, and plan the full window. We quote both parts separately.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.