For projects in Brisbane
Cinema and multiplex soundproofing in Brisbane
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. School halls, community centres and church buildings carry assembly, performance and sport in one hard volume.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this is, and what it changes in a Brisbane room
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
School halls, community centres and church buildings carry assembly, performance and sport in one hard volume.
Work reaching us from Brisbane is mostly timber housing and renovations, apartments, offices, venues, schools, clinics.
- Houses raised on stumps A timber floor over open air has almost no mass and nothing below it. Adding mass and closing the underfloor does more than anything applied inside the room.
- Subtropical humidity PET felt does not absorb moisture, shed fibre or feed mould, which matters through a humid summer where mineral products sag.
- Apartments built light and fast The same separating detail repeated across a development. Worth solving on the drawing rather than after settlement.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Brisbane.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Brisbane, ducted systems and split units, with outdoor units close to boundaries where neighbour noise limits apply.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Brisbane, school halls, community centres and church buildings carry assembly, performance and sport in one hard volume.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Brisbane, school buildings run hard floors and high ceilings, and open plan learning areas make speech intelligibility the central problem rather than echo.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
Architects working in Brisbane usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / On the ground
What we see driving Brisbane briefs
- Houses raised on stumps
A timber floor over open air has almost no mass and nothing below it. Adding mass and closing the underfloor does more than anything applied inside the room.
- Subtropical humidity
PET felt does not absorb moisture, shed fibre or feed mould, which matters through a humid summer where mineral products sag.
- Apartments built light and fast
The same separating detail repeated across a development. Worth solving on the drawing rather than after settlement.
- A long sea leg
One of the longer routes we run. Ordering to a real schedule matters, so we quote the full window rather than the port date.
- Assembly and performance rooms
School halls, community centres and church buildings carry assembly, performance and sport in one hard volume.
04 / Room by room
What each space in a Brisbane project needs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. A timber floor over open air has almost no mass and nothing below it. Adding mass and closing the underfloor does more than anything applied inside the room.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. PET felt does not absorb moisture, shed fibre or feed mould, which matters through a humid summer where mineral products sag.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Plant and projection
Equipment noise into the auditorium, treated at source. The same separating detail repeated across a development. Worth solving on the drawing rather than after settlement.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Durability
Why the climate in Brisbane changes the material, not the target
Brisbane is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Worth knowing
Where this kind of project usually fails
-
A shared service void running across the wall line
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Brisbane job
A timber floor over open air has almost no mass and nothing below it. Adding mass and closing the underfloor does more than anything applied inside the room.
05 / Supply
How material reaches a Brisbane site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Port of Brisbane, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Port of Brisbane |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into the Port of Brisbane, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Brisbane projects
What makes cinema and multiplex soundproofing different in Brisbane?
School halls, community centres and church buildings carry assembly, performance and sport in one hard volume. A timber floor over open air has almost no mass and nothing below it. Adding mass and closing the underfloor does more than anything applied inside the room.
Where should the budget go first on a Brisbane project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Brisbane?
No. We manufacture in India and supply into Brisbane. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Brisbane site?
ships from: Palwal, Haryana, India, arrives at: Port of Brisbane, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.