Home > Brazil > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Brazil

Cinema and multiplex soundproofing in Brazil

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in Brazil

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.

Work reaching us from Brazil is mostly offices and corporate towers, apartments, hotels, schools, hospitals, studios.

  • Concrete and block, hard inside The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
  • Impact through slabs Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
  • A long sea leg and a real import process Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Brazil.

Multiplex and cinema soundproofing

02 / The build-up

What goes where, from the structure in

  1. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 1

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Brazil, split units and VRF, with condensers in light wells and on facades close to bedrooms.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Brazil, churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Brazil, classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

Architects working in Brazil usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / On the ground

What decides the build-up in Brazil

  • Concrete and block, hard inside

    The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

  • Impact through slabs

    Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.

  • A long sea leg and a real import process

    Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.

  • Humid in most of the country

    PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a few seasons.

  • Assembly and performance rooms

    Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.

04 / Room by room

What each space in a Brazil project needs

For a Brazil interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

The Brazil climate decides the material list

Brazil is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Where a consultant is already engaged on a Brazil project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

What we watch go wrong on jobs like this

  • A shared service void running across the wall line

    A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.

  • Treating the auditorium to fix bleed from the next screen

    This is the one that comes back as a second fit-out rather than a snag.

  • Doors and lobbies specified late and undersized

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating it as a generic Brazil job

    The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

05 / Logistics

What the route into Brazil actually looks like

Supply into Brazil
Ships fromPalwal, Haryana, India
Arrives atSantos or Paranaguá, then road to site
Dispatch4 to 7 working days
FreightSea via Santos
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Santos or Paranaguá, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Brazil projects

What makes cinema and multiplex soundproofing different in Brazil?

Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

Where should the budget go first on a Brazil project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Brazil?

No. We manufacture in India and supply into Brazil. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Brazil site?

ships from: Palwal, Haryana, India, arrives at: Santos or Paranaguá, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.