For projects in Brazil
HVAC, plant and machine noise control in Brazil
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and VRF, with condensers in light wells and on facades close to bedrooms.
- At source
- Enclosure, barrier or anti vibration mounts at the machine.
- In the path
- Duct lining, attenuators and lagging on the first run out of the plant.
- At the receiver
- Only after the first two, and only for what is left.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this is, and what it changes in a Brazil room
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.
Split units and VRF, with condensers in light wells and on facades close to bedrooms.
Work reaching us from Brazil is mostly offices and corporate towers, apartments, hotels, schools, hospitals, studios.
- Concrete and block, hard inside The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Impact through slabs Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- A long sea leg and a real import process Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- At source Enclosure, barrier or anti vibration mounts at the machine.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Brazil.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Brazil, split units and VRF, with condensers in light wells and on facades close to bedrooms.
On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.
-

Layer 2
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Brazil, churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Brazil, classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
For a Brazil practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / On the ground
What the buildings in Brazil do to the specification
- Concrete and block, hard inside
The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Impact through slabs
Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- A long sea leg and a real import process
Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Humid in most of the country
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a few seasons.
- Plant and HVAC
Split units and VRF, with condensers in light wells and on facades close to bedrooms.
04 / Room by room
Room by room, on a typical Brazil job
-

At source
Enclosure, barrier or anti vibration mounts at the machine. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic foam and BassBloc, 20 mm
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

In the path
Duct lining, attenuators and lagging on the first run out of the plant. Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic foam and BassBloc, 100 kg per cubic metre
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

At the receiver
Only after the first two, and only for what is left. Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic foam and BassBloc, 100 to 500 Hz
- Ceiling baffles and clouds, ASTM C423
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate
The Brazil climate decides the material list
Brazil is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Absorption on the office wall for a plant room problem
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Lagging a duct that is carrying the noise as breakout from the fan
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Ignoring structure borne vibration through the mounts
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating it as a generic Brazil job
The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
05 / Supply
Getting it to Brazil, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Santos or Paranaguá, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Santos |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Santos or Paranaguá, then road to site. Air freight for samples and urgent quantities.
Questions from Brazil projects
What makes HVAC, plant and machine noise control different in Brazil?
Split units and VRF, with condensers in light wells and on facades close to bedrooms. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
Where should the budget go first on a Brazil project?
At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.
Do you have an office or installation team in Brazil?
No. We manufacture in India and supply into Brazil. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Brazil site?
ships from: Palwal, Haryana, India, arrives at: Santos or Paranaguá, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.