Home > Brazil > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Brazil

HVAC, plant and machine noise control in Brazil

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and VRF, with condensers in light wells and on facades close to bedrooms.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The product

What this is, and what it changes in a Brazil room

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units and VRF, with condensers in light wells and on facades close to bedrooms.

Work reaching us from Brazil is mostly offices and corporate towers, apartments, hotels, schools, hospitals, studios.

  • Concrete and block, hard inside The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
  • Impact through slabs Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
  • A long sea leg and a real import process Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Brazil.

HVAC duct soundproofing Machine noise control

02 / The build-up

The stack, in the order it is installed

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Brazil, split units and VRF, with condensers in light wells and on facades close to bedrooms.

    On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Brazil, churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Brazil, classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

For a Brazil practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / On the ground

What the buildings in Brazil do to the specification

  • Concrete and block, hard inside

    The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

  • Impact through slabs

    Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.

  • A long sea leg and a real import process

    Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.

  • Humid in most of the country

    PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a few seasons.

  • Plant and HVAC

    Split units and VRF, with condensers in light wells and on facades close to bedrooms.

04 / Room by room

Room by room, on a typical Brazil job

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate

The Brazil climate decides the material list

Brazil is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • Absorption on the office wall for a plant room problem

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Ignoring structure borne vibration through the mounts

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Brazil job

    The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

05 / Supply

Getting it to Brazil, with real dates

Supply into Brazil
Ships fromPalwal, Haryana, India
Arrives atSantos or Paranaguá, then road to site
Dispatch4 to 7 working days
FreightSea via Santos
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Santos or Paranaguá, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Brazil projects

What makes HVAC, plant and machine noise control different in Brazil?

Split units and VRF, with condensers in light wells and on facades close to bedrooms. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.

Where should the budget go first on a Brazil project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Brazil?

No. We manufacture in India and supply into Brazil. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Brazil site?

ships from: Palwal, Haryana, India, arrives at: Santos or Paranaguá, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.