For projects in Brazil
Auditorium acoustics and soundproofing in Brazil
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Brazil job
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
Work reaching us from Brazil is mostly offices and corporate towers, apartments, hotels, schools, hospitals, studios.
- Concrete and block, hard inside The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Impact through slabs Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- A long sea leg and a real import process Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Brazil.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Brazil, split units and VRF, with condensers in light wells and on facades close to bedrooms.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Brazil, churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Brazil, classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / Local conditions
The Brazil conditions that change the answer
- Concrete and block, hard inside
The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Impact through slabs
Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- A long sea leg and a real import process
Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Humid in most of the country
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag within a few seasons.
- Assembly and performance rooms
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
- School and campus buildings
Classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.
04 / Room by room
What each space in a Brazil project needs
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
- Wood wool acoustic panels, 1200 x 600 mm
- Wooden slat acoustic panels, 13-3, 14-2, 28-4 and 59-5
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. Hard flooring over concrete passes footfall straight down between apartments. A resilient underlay before the finish is the fix.
- Wood wool acoustic panels, 20 mm
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

Rear wall
The single worst surface in most halls, and the first one to treat. Transit is long and customs takes time. We quote the full window and give you the documentation package up front rather than after the container sails.
- Wood wool acoustic panels, 400 kg per cubic metre
- Wooden slat acoustic panels, 14, 16 and 18 mm
- Ceiling baffles and clouds, ASTM C423
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate
Durability in Brazil, before acoustics is discussed
Brazil is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Where a consultant is already engaged on a Brazil project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Before you buy
Six mistakes that turn into a second fit-out
-
Absorbing the whole room and losing the back rows
This is the one that comes back as a second fit-out rather than a snag.
-
Adding speakers to fix a reverberation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Ignoring the rear wall because it is behind the audience
Small on the drawing, expensive on site, and almost always found after handover.
-
Treating it as a generic Brazil job
The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
05 / Supply
Getting it to Brazil, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Santos or Paranaguá, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Santos |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Santos or Paranaguá, then road to site. Air freight for samples and urgent quantities.
Questions from Brazil projects
What makes auditorium acoustics and soundproofing different in Brazil?
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level. The structure blocks well. The rooms are tile, glass and plaster with nothing to absorb anything, so speech carries and lecture rooms fail.
Where should the budget go first on a Brazil project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Brazil?
No. We manufacture in India and supply into Brazil. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Brazil site?
ships from: Palwal, Haryana, India, arrives at: Santos or Paranaguá, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.