Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Bhubaneswar job
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room.
Work reaching us from Bhubaneswar is mostly IT and institutional campuses, hospitals, colleges, auditoriums, hotels, offices.
- New campuses at scale The same classroom or office detail repeated across many blocks. Consistency across the order is where the value is.
- Coastal humidity and cyclones PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a couple of seasons.
- Teaching and assembly rooms Large halls in concrete and tile that defeat the speaker long before anyone calls the room echoey.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Bhubaneswar.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Bhubaneswar, split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 2
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Bhubaneswar, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Bhubaneswar, new university and school campuses in concrete and tile, with lecture halls and hostels repeating the same detail.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
Architects working in Bhubaneswar usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What we see driving Bhubaneswar briefs
- New campuses at scale
The same classroom or office detail repeated across many blocks. Consistency across the order is where the value is.
- Coastal humidity and cyclones
PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a couple of seasons.
- Teaching and assembly rooms
Large halls in concrete and tile that defeat the speaker long before anyone calls the room echoey.
- Three to four days by road
A dedicated truck from Palwal, confirmed before dispatch, with samples sent ahead.
- The housing stock
RC frame apartments and houses with hard floors, built for heat and heavy monsoon along a cyclone exposed coast.
- The studio and content scene
Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room.
04 / Room by room
Where the money goes on a Bhubaneswar project
-

Isolation
A measured background level, agreed before anything is bought. The same classroom or office detail repeated across many blocks. Consistency across the order is where the value is.
- Acoustic foam and BassBloc, 1800 x 900 mm
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. PET felt does not absorb moisture, rot or feed mould, which matters where mineral products sag within a couple of seasons.
- Acoustic foam and BassBloc, 20 mm
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
-

Early reflections
Controlled at the mix position, and only there. Large halls in concrete and tile that defeat the speaker long before anyone calls the room echoey.
- Acoustic foam and BassBloc, 100 kg per cubic metre
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate and durability
Why the climate in Bhubaneswar changes the material, not the target
Bhubaneswar is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
On a Bhubaneswar job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Worth knowing
Six mistakes that turn into a second fit-out
-
Buying foam to solve an isolation problem
Small on the drawing, expensive on site, and almost always found after handover.
-
Treating the room before the shell is isolated
This is the one that comes back as a second fit-out rather than a snag.
-
Killing the room completely and calling it controlled
We would rather calculate the area and sell you less of it than line every surface and call it thorough.
-
Treating it as a generic Bhubaneswar job
The same classroom or office detail repeated across many blocks. Consistency across the order is where the value is.
05 / Getting it there
Supply into Bhubaneswar, start to site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | three to four days |
| Dispatch | 2 to 4 working days |
| To site | three to four days |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly fifteen hundred kilometres, normally three to four days on a dedicated truck.
Questions from Bhubaneswar projects
What makes recording studio acoustics and soundproofing different in Bhubaneswar?
Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room. The same classroom or office detail repeated across many blocks. Consistency across the order is where the value is.
Where should the budget go first on a Bhubaneswar project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Bhubaneswar?
No. We manufacture in India and supply into Bhubaneswar. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Bhubaneswar site?
made at: Our own plant, Palwal, Haryana, reaches site in: three to four days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.