Manufactured in India, supplied in Al Khobar
Acoustic panels in Al Khobar
We manufacture acoustic panels at our own plant at Palwal in Haryana, India, and supply them into Al Khobar. Made at our own plant in India and shipped into Dammam, which puts the port on the doorstep of most Eastern Province sites.
- Plain PET felt
- 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
- Printed felt
- 1800 x 900 mm, image printed into the felt rather than onto a facing
- Grooved panels
- Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Test standard
- ASTM C423
- Lead time
- 4 to 7 working days standard
- Minimum order
- From 10 panels
- ASTM C423
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / The material
What this is, and what it changes in a Al Khobar room
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look.
Work reaching us from Al Khobar is mostly control rooms and plant, corporate offices, compound housing, hotels, clinics, schools.
Villas and apartment blocks are concrete and block with hard stone or tile throughout. Mass is there, but every room is live and impact noise between floors is untreated.
- Wall array Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
- Ceiling first In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
- Mixed finish Plain felt where it is out of eye line, printed or grooved where it is seen.
- What it will not do Coverage is not the target, reverberation time is. Lining every surface wastes money and can leave a room sounding dead and unpleasant.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our acoustic panel range are on the main product page. This page covers what that means for a project in Al Khobar.
PET felt acoustic panels Printed acoustic felt panels Grooved PET panels
02 / Data sheet
Published specification, identical wherever we ship it
These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.
- EchoCore 151500 GSM. General commercial
- EchoPro 181800 GSM. Rooms with a written RT target
- EchoMax 222200 GSM. High occupancy and high level spaces
| Plain PET felt | 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM |
|---|---|
| Printed felt | 1800 x 900 mm, image printed into the felt rather than onto a facing |
| Grooved panels | Cut pattern in PET felt, adds visual rhythm without changing the absorber |
| Test standard | ASTM C423 |
On a Al Khobar job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
03 / In this market
What decides the build-up in Al Khobar
- Heat, dust and sealed buildings
Buildings stay closed with heavy cooling running year round. Plant noise has nowhere to escape, and rooms get hard and live inside.
- Industrial noise is a different problem
Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will.
- Control rooms and operations centres
People sit in these rooms for twelve hours listening to alarms and radios. Intelligibility matters more than a reverberation figure on a sheet.
- Port on the doorstep
Dammam is close, so the road leg is short and the landed cost is predictable. That is the practical reason a factory in India can serve this market on schedule.
- School and campus buildings
New school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
- The studio and content scene
Media and content production is growing quickly, and rooms are being built inside existing commercial shells with no isolation plan. The background noise floor is usually the first problem to solve.
We would rather argue about the build-up at design stage than on site. See how we support architects.
04 / Climate
What the Al Khobar climate rules in and rules out
Al Khobar is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The risk we design against here is dust ingress and thermal movement in long runs.
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
05 / Supply
How material reaches a Al Khobar site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dammam, then a short road run across the Eastern Province |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Dammam |
| Packing | Palletised flat and film wrapped. Printed panels interleaved and corner protected. |
| Lead time | 4 to 7 working days standard. Printed and grooved take longer. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Dammam, then a short road run to site. Air freight for samples and urgent quantities.
200 panels for a trial order, in any mix of thickness, GSM and colour. Beyond a trial we would rather quote a container load.
| Trial order | 200 panels, 6,400 sq ft, mixed thickness, GSM and colour |
|---|---|
| Recommended | Full container |
A panel is 1220 x 2440 mm, which is 32 sq ft.
06 / Straight talk
The things worth knowing before you place the order
-
The wrong product for the problem
Coverage is not the target, reverberation time is. Lining every surface wastes money and can leave a room sounding dead and unpleasant. We would rather calculate the area than sell the wall.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
Suppliers who imply a Al Khobar presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
How it looks once it is installed
Al Khobar: questions we are actually asked
Is there a Al Khobar factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Al Khobar as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Dammam, which puts the port on the doorstep of most Eastern Province sites. You buy at factory prices with one consistent batch across the order.
Why would a Al Khobar build-up differ from anywhere else?
Compressors, generators and process plant are low frequency and structure-borne. Panels on a wall will not touch that. Mass, isolation and sealing will. People sit in these rooms for twelve hours listening to alarms and radios. Intelligibility matters more than a reverberation figure on a sheet. Those two things move the build-up far more than the panel figure does.
Is this the right material for Al Khobar conditions?
Al Khobar is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.
How quickly can material reach a site in Al Khobar?
ships from: Palwal, Haryana, India, arrives at: Dammam, then a short road run across the Eastern Province, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Where do acoustic panels fail to help?
Coverage is not the target, reverberation time is. Lining every surface wastes money and can leave a room sounding dead and unpleasant. We would rather calculate the area than sell the wall.
What quantity do we have to order, and in what packaging?
200 panels for a trial order, in any mix of thickness, GSM and colour. Beyond a trial we would rather quote a container load. Trial order, 200 panels, 6,400 sq ft, mixed thickness, GSM and colour. Recommended, Full container. A panel is 1220 x 2440 mm, which is 32 sq ft. Palletised flat and film wrapped. Printed panels interleaved and corner protected.
Next step
Tell us the room, we will tell you the build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.