For projects in Zurich
Home theatre soundproofing and acoustics in Zurich
Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is. Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes.
- Containment
- Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
- Low frequency inside
- Corner absorption with depth, before any surface treatment.
- Reflections
- Side wall and ceiling first reflection points at the seating position.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Zurich
Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is.
Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes.
Work reaching us from Zurich is mostly banking and professional offices, industrial conversions, apartments, clinics, restaurants, studios.
- Confidentiality is the requirement On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
- Industrial conversions in the west Old industrial buildings give superb volume and terrible acoustics. Hard shells, big cubic volume and nothing soft, so the ceiling plane has to carry the whole room.
- Depth costs real money here Zurich floor area is among the most expensive in Europe. A thinner build-up that performs is worth more than a thicker one that performs slightly better.
- Containment Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for home theatre soundproofing are on the main product page. This page covers what that means for a project in Zurich.
02 / The build-up
What goes where, from the structure in
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Zurich, mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Zurich, concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Zurich, school buildings are built to a high standard with hard cleanable surfaces, so rooms stay live and intelligibility is the target.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
Architects working in Zurich usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / On the ground
The Zurich conditions that change the answer
- Confidentiality is the requirement
On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
- Industrial conversions in the west
Old industrial buildings give superb volume and terrible acoustics. Hard shells, big cubic volume and nothing soft, so the ceiling plane has to carry the whole room.
- Depth costs real money here
Zurich floor area is among the most expensive in Europe. A thinner build-up that performs is worth more than a thicker one that performs slightly better.
- Trams and dense streets
Ground level trams put low frequency into the structure. That is a structural isolation question, and panels on a wall will not answer it.
- The housing stock
Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes.
04 / Room by room
What each space in a Zurich project needs
-

Containment
Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Soundproof curtains, 10 to 12 mm
- Acoustic carpet and rugs, High density polyester
-

Low frequency inside
Corner absorption with depth, before any surface treatment. Old industrial buildings give superb volume and terrible acoustics. Hard shells, big cubic volume and nothing soft, so the ceiling plane has to carry the whole room.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Soundproof curtains, 5.5 kg per sq m
- Acoustic carpet and rugs, Felt
-

Reflections
Side wall and ceiling first reflection points at the seating position. Zurich floor area is among the most expensive in Europe. A thinner build-up that performs is worth more than a thicker one that performs slightly better.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Soundproof curtains, Up to 30 dB
- Acoustic carpet and rugs, 64 sq ft per pack
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
Why the climate in Zurich changes the material, not the target
Zurich is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Where a consultant is already engaged on a Zurich project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Straight talk
The six errors that cost the most
-
Foam on the walls as a soundproofing measure
This is the one that comes back as a second fit-out rather than a snag.
-
A standard door on a room built to hold bass
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating before the room is sealed
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Zurich job
On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
05 / Supply
Getting it to Zurich, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Rotterdam or Antwerp, then rail into Zurich |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Rotterdam, then rail |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Rotterdam or Antwerp, then rail into Zurich. Air freight for samples and urgent quantities.
Questions from Zurich projects
What makes home theatre soundproofing and acoustics different in Zurich?
Concrete and masonry construction built to a high standard, with good mass and very hard internal finishes. On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
Where should the budget go first on a Zurich project?
Containment. Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Low frequency inside. Corner absorption with depth, before any surface treatment.
Do you have an office or installation team in Zurich?
No. We manufacture in India and supply into Zurich. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Zurich site?
ships from: Palwal, Haryana, India, arrives at: Rotterdam or Antwerp, then rail into Zurich, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Foam on the walls as a soundproofing measure. A standard door on a room built to hold bass.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.