For projects in Zurich
Cinema and multiplex soundproofing in Zurich
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this material is and where it earns its place in Zurich
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.
Work reaching us from Zurich is mostly banking and professional offices, industrial conversions, apartments, clinics, restaurants, studios.
- Confidentiality is the requirement On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
- Industrial conversions in the west Old industrial buildings give superb volume and terrible acoustics. Hard shells, big cubic volume and nothing soft, so the ceiling plane has to carry the whole room.
- Depth costs real money here Zurich floor area is among the most expensive in Europe. A thinner build-up that performs is worth more than a thicker one that performs slightly better.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Zurich.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Zurich, mechanical ventilation with heat recovery is standard, so duct and terminal unit noise are the sources.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Zurich, concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Zurich, school buildings are built to a high standard with hard cleanable surfaces, so rooms stay live and intelligibility is the target.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / Local conditions
What decides the build-up in Zurich
- Confidentiality is the requirement
On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
- Industrial conversions in the west
Old industrial buildings give superb volume and terrible acoustics. Hard shells, big cubic volume and nothing soft, so the ceiling plane has to carry the whole room.
- Depth costs real money here
Zurich floor area is among the most expensive in Europe. A thinner build-up that performs is worth more than a thicker one that performs slightly better.
- Trams and dense streets
Ground level trams put low frequency into the structure. That is a structural isolation question, and panels on a wall will not answer it.
- Assembly and performance rooms
Concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible.
04 / Room by room
Room by room, on a typical Zurich job
-

Screen to screen
Independent construction between auditoria, with services broken at the line. On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- PET felt acoustic panels, 4 to 24 mm
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Old industrial buildings give superb volume and terrible acoustics. Hard shells, big cubic volume and nothing soft, so the ceiling plane has to carry the whole room.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
-

Plant and projection
Equipment noise into the auditorium, treated at source. Zurich floor area is among the most expensive in Europe. A thinner build-up that performs is worth more than a thicker one that performs slightly better.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- PET felt acoustic panels, 2440 x 4270 mm, 2.44 x 4.27 m, 8 x 14 ft
For a Zurich interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate
Durability in Zurich, before acoustics is discussed
Zurich is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Where a consultant is already engaged on a Zurich project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Worth knowing
Where this kind of project usually fails
-
A shared service void running across the wall line
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating the auditorium to fix bleed from the next screen
This is the one that comes back as a second fit-out rather than a snag.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Zurich job
On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
05 / Getting it there
Supply into Zurich, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Rotterdam or Antwerp, then rail into Zurich |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Rotterdam, then rail |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Rotterdam or Antwerp, then rail into Zurich. Air freight for samples and urgent quantities.
Questions from Zurich projects
What makes cinema and multiplex soundproofing different in Zurich?
Concert halls, church buildings and civic rooms are long-decay volumes where interventions must be reversible. On a banking or professional floor the question is not comfort, it is whether a conversation leaves the room. Absorption plus a proper partition and door detail is what delivers that.
Where should the budget go first on a Zurich project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Zurich?
No. We manufacture in India and supply into Zurich. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Zurich site?
ships from: Palwal, Haryana, India, arrives at: Rotterdam or Antwerp, then rail into Zurich, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.