Home > Washington DC > SoundBlanket mass loaded vinyl

SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

Manufactured in India, supplied in Washington DC

SoundBlanket mass loaded vinyl in Washington DC

We manufacture soundBlanket mass loaded vinyl at our own plant at Palwal in Haryana, India, and supply them into Washington DC. Made at our own plant in India and shipped into Baltimore or Norfolk, then a short road run into the city, with the full transit window quoted openly.

Density
2100 kg per cubic metre
2.5 mm
STC 30, 5.25 kg per sq m
4 mm
STC 34, 8.4 kg per sq m
6 mm
12.6 kg per sq m, STC on request
Roll size
5 x 1.2 m, 6 sq m per roll
Lead time
4 to 7 working days
Minimum order
From 10 rolls
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs
  • Test reports sent on request, not just quoted

We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.

01 / What it is

The material, and what it actually does on a Washington DC job

A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. It is the barrier product, not an absorber, and it is the right answer when the problem is noise passing through a structure.

Work reaching us from Washington DC is mostly institutional and association offices, meeting and briefing rooms, hotels, schools, clinics.

American homes are timber frame with gypsum board on both faces, so a party wall or a basement ceiling has almost no mass. Adding a second leaf with a limp membrane between does more than any amount of surface treatment.

  • Wall, decoupled Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
  • Floor, floating Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
  • Duct and plant wrap Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
  • What it will not do Mass fixed hard to an existing wall gives far less than the same mass on an independent leaf. If we are told the wall cannot be thickened, we will say what the membrane will and will not achieve rather than quote the laboratory figure and let the site find out.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for SoundBlanket MLV are on the main product page. This page covers what that means for a project in Washington DC.

SoundBlanket mass loaded vinyl

02 / Specification

The published figures, unchanged by location

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • 2.5 mmSTC 30, 5.25 kg per sq m. Ducts, light partitions, retrofit where depth is tight
  • 4 mmSTC 34, 8.4 kg per sq m. Party walls, floors, plant rooms, the common specification
  • 6 mm12.6 kg per sq m. Machine enclosures and low frequency problems
SoundBlanket mass loaded vinyl: published specification
Density2100 kg per cubic metre
2.5 mmSTC 30, 5.25 kg per sq m
4 mmSTC 34, 8.4 kg per sq m
6 mm12.6 kg per sq m, STC on request
Roll size5 x 1.2 m, 6 sq m per roll
FormLimp sheet, cuts with a knife, seams lapped and sealed

On a Washington DC job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

03 / On the ground

What we see driving Washington DC briefs

  • Privacy is the actual requirement

    The question here is whether a conversation can be understood outside the room, not whether the room sounds pleasant. That needs the partition, the door and the ceiling handled together.

  • Wide floorplates, low buildings

    The height limit pushes buildings outward, so floors are broad and deep. Sound travels a long way across an open plan with nothing to interrupt it.

  • Historic fabric downtown

    Plenty of stock is old and protected. The work has to be internal and shallow, which rules out most thick framed systems.

  • Meeting rooms used constantly

    Association and institutional offices are mostly meeting space. Every one of those rooms has the same two demands: clear inside, inaudible outside.

  • The housing stock

    American homes are timber frame with gypsum board on both faces, so a party wall or a basement ceiling has almost no mass. Adding a second leaf with a limp membrane between does more than any amount of surface treatment.

  • The studio and content scene

    Home and project studios go into basements and converted garages with equipment budgets far ahead of the building. The room leaks to the floor above long before it sounds wrong inside.

For a Washington DC practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

04 / Climate and durability

Why the climate in Washington DC changes the material, not the target

Washington DC is mild summers and cold, wet winters, and that narrows the sensible material list before acoustics is even discussed.

Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.

The risk we design against here is condensation and cold bridging behind new linings.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

05 / Route to site

Getting it to Washington DC, with real dates

Supply into Washington DC
Ships fromPalwal, Haryana, India
Arrives atBaltimore or Norfolk, then road into the city
Dispatch4 to 7 working days
FreightSea via Baltimore or Norfolk
PackingRolls on core tubes, wrapped and end capped, 5 x 1.2 m. Weights on the packing list, because a full roll is heavy and site access matters.
Lead time4 to 7 working days. Full container quantities scheduled against the vessel.

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Baltimore or Norfolk, then a short road run into the city. Air freight for samples and urgent quantities.

The same minimums apply on export as on domestic orders.

Minimum order, soundblanket mass loaded vinyl
2.5 mm and 4 mm10 rolls, 60 sq m
6 mm and other thicknesses10 tonnes per thickness

A SoundBlanket roll is 5 x 1.2 m, which is 6 sq m. At 2100 kg per cubic metre a roll weighs about 31.5 kg at 2.5 mm and about 50.4 kg at 4 mm, so a 10 roll minimum is 60 sq m and roughly 315 kg at 2.5 mm or 504 kg at 4 mm.

06 / Worth knowing

Four honest warnings before you buy

  • The wrong product for the problem

    Mass fixed hard to an existing wall gives far less than the same mass on an independent leaf. If we are told the wall cannot be thickened, we will say what the membrane will and will not achieve rather than quote the laboratory figure and let the site find out.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • Suppliers who imply a Washington DC presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

FAQ

Washington DC: questions we are actually asked

Is there a Washington DC factory behind this product?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Washington DC as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Baltimore or Norfolk, then a short road run into the city, with the full transit window quoted openly. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Washington DC job?

The question here is whether a conversation can be understood outside the room, not whether the room sounds pleasant. That needs the partition, the door and the ceiling handled together. The height limit pushes buildings outward, so floors are broad and deep. Sound travels a long way across an open plan with nothing to interrupt it. Those two things move the build-up far more than the panel figure does.

How does the Washington DC climate affect this product?

Washington DC is mild summers and cold, wet winters. Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air. The failure we design against here is condensation and cold bridging behind new linings.

How quickly can material reach a site in Washington DC?

ships from: Palwal, Haryana, India, arrives at: Baltimore or Norfolk, then road into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What should you not buy soundBlanket mass loaded vinyl for?

Mass fixed hard to an existing wall gives far less than the same mass on an independent leaf. If we are told the wall cannot be thickened, we will say what the membrane will and will not achieve rather than quote the laboratory figure and let the site find out.

Is there a minimum order, and how does it arrive?

The same minimums apply on export as on domestic orders. 2.5 mm and 4 mm, 10 rolls, 60 sq m. 6 mm and other thicknesses, 10 tonnes per thickness. A SoundBlanket roll is 5 x 1.2 m, which is 6 sq m. At 2100 kg per cubic metre a roll weighs about 31.5 kg at 2.5 mm and about 50.4 kg at 4 mm, so a 10 roll minimum is 60 sq m and roughly 315 kg at 2.5 mm or 504 kg at 4 mm. Rolls on core tubes, wrapped and end capped, 5 x 1.2 m. Weights on the packing list, because a full roll is heavy and site access matters.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.