Home > Thane > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Thane

Cinema and multiplex soundproofing in Thane

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The product

What you are buying, and what it fixes in Thane

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

Work reaching us from Thane is mostly residential towers and redevelopment, offices, malls and retail, restaurants, schools, clinics.

  • Impact noise from above Footfall through a slab is the most common complaint we get from this city. It is a floor problem, and treating the ceiling below rarely fixes it.
  • Redevelopment at speed Old buildings replaced by towers, built fast to a fixed cost. Acoustic detail is easy to lose unless it is specified early.
  • Lifts, pumps and services Shafts and pump rooms sit next to bedrooms in tight plans. That is an isolation job at the source.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Thane.

Multiplex and cinema soundproofing

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Thane, split units, VRF outdoor banks and diesel generator sets sit close to occupied areas, often on the same terrace as a bedroom. Generator enclosure and condenser screening are the recurring jobs.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Thane, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Thane, schools range from compact municipal buildings to large private campuses, all hard surfaced, with assembly halls doing duty as performance spaces.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

Architects working in Thane usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

The Thane conditions that change the answer

  • Impact noise from above

    Footfall through a slab is the most common complaint we get from this city. It is a floor problem, and treating the ceiling below rarely fixes it.

  • Redevelopment at speed

    Old buildings replaced by towers, built fast to a fixed cost. Acoustic detail is easy to lose unless it is specified early.

  • Lifts, pumps and services

    Shafts and pump rooms sit next to bedrooms in tight plans. That is an isolation job at the source.

  • Coastal humidity

    PET felt does not absorb moisture or feed mould, which matters where monsoon damp defeats mineral products.

  • Assembly and performance rooms

    Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

04 / Room by room

What each space in a Thane project needs

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. Footfall through a slab is the most common complaint we get from this city. It is a floor problem, and treating the ceiling below rarely fixes it.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. Old buildings replaced by towers, built fast to a fixed cost. Acoustic detail is easy to lose unless it is specified early.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Shafts and pump rooms sit next to bedrooms in tight plans. That is an isolation job at the source.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

The Thane climate decides the material list

Thane is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Worth knowing

Where this kind of project usually fails

  • A shared service void running across the wall line

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating the auditorium to fix bleed from the next screen

    Small on the drawing, expensive on site, and almost always found after handover.

  • Doors and lobbies specified late and undersized

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating it as a generic Thane job

    Footfall through a slab is the most common complaint we get from this city. It is a floor problem, and treating the ceiling below rarely fixes it.

05 / Logistics

Getting it to Thane, with real dates

Supply into Thane
Made atOur own plant, Palwal, Haryana
Reaches site inthree to four days
Dispatch2 to 4 working days
To sitethree to four days
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly fourteen hundred kilometres, normally three to four days on a dedicated truck.

FAQ

Questions from Thane projects

What makes cinema and multiplex soundproofing different in Thane?

Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey. Footfall through a slab is the most common complaint we get from this city. It is a floor problem, and treating the ceiling below rarely fixes it.

Where should the budget go first on a Thane project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Thane?

No. We manufacture in India and supply into Thane. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Thane site?

made at: Our own plant, Palwal, Haryana, reaches site in: three to four days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.