For projects in Thailand
Venue and restaurant acoustics in Thailand
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Thailand
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.
Work reaching us from Thailand is mostly industrial estates and plant, resorts and hotels, offices, hospitals, schools, studios.
- Two different markets Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Heat and humidity all year PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Cooling plant never stops Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Thailand.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
What goes where, from the structure in
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Thailand, split units and VRF with condensers on balconies and in light wells, running at full load most of the year.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Thailand, temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Thailand, classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / In this market
What the buildings in Thailand do to the specification
- Two different markets
Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Heat and humidity all year
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Cooling plant never stops
Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Resort programmes have fixed dates
Openings do not move. We give honest dispatch and transit windows rather than optimistic ones.
- Assembly and performance rooms
Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.
04 / Room by room
Space by space, for Thailand briefs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
For a Thailand interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Conditions
The Thailand climate decides the material list
Thailand is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Where a consultant is already engaged on a Thailand project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Panels on the wall as a neighbour noise solution
Small on the drawing, expensive on site, and almost always found after handover.
-
A lobby with both doors able to open at once
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Thailand job
Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
05 / Supply
What the route into Thailand actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Laem Chabang, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Laem Chabang |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Laem Chabang, then road to site. Air freight for samples and urgent quantities.
Questions from Thailand projects
What makes venue and restaurant acoustics different in Thailand?
Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
Where should the budget go first on a Thailand project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Thailand?
No. We manufacture in India and supply into Thailand. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Thailand site?
ships from: Palwal, Haryana, India, arrives at: Laem Chabang, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.