Recording studio acoustics and soundproofing in Thailand
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A large content and music production scene works out of rooms inside commercial buildings with thin partitions.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Thailand brief
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
A large content and music production scene works out of rooms inside commercial buildings with thin partitions.
Work reaching us from Thailand is mostly industrial estates and plant, resorts and hotels, offices, hospitals, schools, studios.
- Two different markets Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Heat and humidity all year PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Cooling plant never stops Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Thailand.
02 / The build-up
What goes where, from the structure in
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Thailand, split units and VRF with condensers on balconies and in light wells, running at full load most of the year.
First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Thailand, temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 3
Soundproof curtains
A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Thailand, classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.
Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.
For a Thailand practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What decides the build-up in Thailand
- Two different markets
Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Heat and humidity all year
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Cooling plant never stops
Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Resort programmes have fixed dates
Openings do not move. We give honest dispatch and transit windows rather than optimistic ones.
- The housing stock
Concrete frame with block infill and hard tile floors throughout. Condominium party walls and slabs pass impact noise directly.
- The studio and content scene
A large content and music production scene works out of rooms inside commercial buildings with thin partitions.
04 / Room by room
Room by room, on a typical Thailand job
-

Isolation
A measured background level, agreed before anything is bought. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Acoustic foam and BassBloc, 1800 x 900 mm
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Acoustic foam and BassBloc, 20 mm
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
-

Early reflections
Controlled at the mix position, and only there. Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Acoustic foam and BassBloc, 100 kg per cubic metre
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
The Thailand climate decides the material list
Thailand is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
On a Thailand job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
Buying foam to solve an isolation problem
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating the room before the shell is isolated
This is the one that comes back as a second fit-out rather than a snag.
-
Killing the room completely and calling it controlled
We would rather calculate the area and sell you less of it than line every surface and call it thorough.
-
Treating it as a generic Thailand job
Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
05 / Supply
What the route into Thailand actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Laem Chabang, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Laem Chabang |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Laem Chabang, then road to site. Air freight for samples and urgent quantities.
Questions from Thailand projects
What makes recording studio acoustics and soundproofing different in Thailand?
A large content and music production scene works out of rooms inside commercial buildings with thin partitions. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
Where should the budget go first on a Thailand project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Thailand?
No. We manufacture in India and supply into Thailand. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Thailand site?
ships from: Palwal, Haryana, India, arrives at: Laem Chabang, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.