For projects in Thailand
Hospital and healthcare acoustics in Thailand
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Split units and VRF with condensers on balconies and in light wells, running at full load most of the year.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this is, and what it changes in a Thailand room
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
Split units and VRF with condensers on balconies and in light wells, running at full load most of the year.
Work reaching us from Thailand is mostly industrial estates and plant, resorts and hotels, offices, hospitals, schools, studios.
- Two different markets Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Heat and humidity all year PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Cooling plant never stops Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Thailand.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Thailand, split units and VRF with condensers on balconies and in light wells, running at full load most of the year.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
-

Layer 2
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Thailand, temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
-

Layer 3
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Thailand, classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / On the ground
What we see driving Thailand briefs
- Two different markets
Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- Heat and humidity all year
PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- Cooling plant never stops
Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- Resort programmes have fixed dates
Openings do not move. We give honest dispatch and transit windows rather than optimistic ones.
- Plant and HVAC
Split units and VRF with condensers on balconies and in light wells, running at full load most of the year.
04 / Room by room
Space by space, for Thailand briefs
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Ceiling baffles and clouds, 9 to 24 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- Acoustic panels, ASTM C423
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
- PET felt acoustic panels, 4 to 24 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate and durability
Why the climate in Thailand changes the material, not the target
Thailand is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Before you buy
The six errors that cost the most
-
Fabric wrapped products in a clinical area
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Absorption used where privacy was the requirement
If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.
-
Ceiling void left open above a partition
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating it as a generic Thailand job
Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
05 / Getting it there
Supply into Thailand, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Laem Chabang, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Laem Chabang |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Laem Chabang, then road to site. Air freight for samples and urgent quantities.
Questions from Thailand projects
What makes hospital and healthcare acoustics different in Thailand?
Split units and VRF with condensers on balconies and in light wells, running at full load most of the year. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
Where should the budget go first on a Thailand project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in Thailand?
No. We manufacture in India and supply into Thailand. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Thailand site?
ships from: Palwal, Haryana, India, arrives at: Laem Chabang, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.