Home > Thailand > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Thailand

Auditorium acoustics and soundproofing in Thailand

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in Thailand

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

Work reaching us from Thailand is mostly industrial estates and plant, resorts and hotels, offices, hospitals, schools, studios.

  • Two different markets Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.
  • Heat and humidity all year PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.
  • Cooling plant never stops Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Thailand.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The stack, in the order it is installed

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Thailand, split units and VRF with condensers on balconies and in light wells, running at full load most of the year.

    On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Thailand, temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Thailand, classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

Architects working in Thailand usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What we see driving Thailand briefs

  • Two different markets

    Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.

  • Heat and humidity all year

    PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.

  • Cooling plant never stops

    Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.

  • Resort programmes have fixed dates

    Openings do not move. We give honest dispatch and transit windows rather than optimistic ones.

  • Assembly and performance rooms

    Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music.

  • School and campus buildings

    Classrooms are hard and naturally ventilated, open to traffic and corridor noise, with large class sizes pushing levels up.

04 / Room by room

Space by space, for Thailand briefs

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. PET felt does not absorb moisture, shed fibre or feed mould, which matters where mineral products sag in a tropical climate.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Large continuous cooling loads next to occupied space generate more complaints than anything happening inside the room.

For a Thailand interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

Durability in Thailand, before acoustics is discussed

Thailand is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Where a consultant is already engaged on a Thailand project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Worth knowing

Where this kind of project usually fails

  • Absorbing the whole room and losing the back rows

    Small on the drawing, expensive on site, and almost always found after handover.

  • Adding speakers to fix a reverberation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Ignoring the rear wall because it is behind the audience

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Thailand job

    Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.

05 / Logistics

Supply into Thailand, start to site

Supply into Thailand
Ships fromPalwal, Haryana, India
Arrives atLaem Chabang, then road to site
Dispatch4 to 7 working days
FreightSea via Laem Chabang
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Laem Chabang, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Thailand projects

What makes auditorium acoustics and soundproofing different in Thailand?

Temples, function halls and hotel ballrooms are tall hard volumes carrying amplified speech and music. Industrial estate work is enclosure and mass. Resort work is guest room isolation and function room acoustics. We quote them differently because they are different problems.

Where should the budget go first on a Thailand project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Thailand?

No. We manufacture in India and supply into Thailand. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Thailand site?

ships from: Palwal, Haryana, India, arrives at: Laem Chabang, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up