Home > Spain > Venue and restaurant acoustics

Nightclub and premium restaurant interior with acoustic treatment

For projects in Spain

Venue and restaurant acoustics in Spain

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other.
Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is.
Quote
From a plan and a section, within 48 hours

01 / The product

What this material is and where it earns its place in Spain

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.

Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.

Work reaching us from Spain is mostly hotels and resorts, restaurants, apartments, offices, schools, clinics, studios.

  • Tile and terrazzo everywhere Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.
  • Season deadlines are real deadlines Coastal and resort work has to be finished before the season opens. We give honest dispatch and transit windows rather than optimistic ones, so the fit-out is not waiting on a container.
  • Late hours, homes above Bars and restaurants run late underneath apartments. The complaint is almost always low frequency and footfall, which means mass and isolation, not foam.
  • Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Spain.

Nightclub and venue soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Spain, split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Spain, churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Spain, school buildings are concrete and tile with high ceilings and hard floors, and dining halls are the loudest rooms in the building.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

Architects working in Spain usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

What we see driving Spain briefs

  • Tile and terrazzo everywhere

    Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.

  • Season deadlines are real deadlines

    Coastal and resort work has to be finished before the season opens. We give honest dispatch and transit windows rather than optimistic ones, so the fit-out is not waiting on a container.

  • Late hours, homes above

    Bars and restaurants run late underneath apartments. The complaint is almost always low frequency and footfall, which means mass and isolation, not foam.

  • Sealed, air-conditioned rooms

    Once a room is closed up against the heat it stops leaking sound outward and starts building it up inside. Absorption has to be balanced, not maximised.

  • Assembly and performance rooms

    Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.

04 / Room by room

What each space in a Spain project needs

  • Wall and ceiling soundproofing layers

    Containment

    Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.

  • Walls with wood wool, felt and wooden slats

    Table level comfort

    Absorption at the ceiling so guests stop raising their voices at each other. Coastal and resort work has to be finished before the season opens. We give honest dispatch and transit windows rather than optimistic ones, so the fit-out is not waiting on a container.

  • Ceiling baffles and clouds in hospitality space

    Entrance and service

    Doors, lobbies and extract paths, which is where most of the leakage actually is. Bars and restaurants run late underneath apartments. The complaint is almost always low frequency and footfall, which means mass and isolation, not foam.

For a Spain interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

What the Spain climate rules in and rules out

Spain is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Worth knowing

What we watch go wrong on jobs like this

  • Panels on the wall as a neighbour noise solution

    This is the one that comes back as a second fit-out rather than a snag.

  • A lobby with both doors able to open at once

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Extract ducting that bypasses every wall you built

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Treating it as a generic Spain job

    Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.

05 / Logistics

Getting it to Spain, with real dates

Supply into Spain
Ships fromPalwal, Haryana, India
Arrives atValencia, Barcelona or Algeciras, then road to site
Dispatch4 to 7 working days
FreightSea via Valencia
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Sea freight into Valencia, Barcelona or Algeciras, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Spain projects

What makes venue and restaurant acoustics different in Spain?

Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times. Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.

Where should the budget go first on a Spain project?

Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.

Do you have an office or installation team in Spain?

No. We manufacture in India and supply into Spain. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Spain site?

ships from: Palwal, Haryana, India, arrives at: Valencia, Barcelona or Algeciras, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

What goes wrong most often on this kind of project?

Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.