For projects in Spain
Cinema and multiplex soundproofing in Spain
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Spain
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
Work reaching us from Spain is mostly hotels and resorts, restaurants, apartments, offices, schools, clinics, studios.
- Tile and terrazzo everywhere Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.
- Season deadlines are real deadlines Coastal and resort work has to be finished before the season opens. We give honest dispatch and transit windows rather than optimistic ones, so the fit-out is not waiting on a container.
- Late hours, homes above Bars and restaurants run late underneath apartments. The complaint is almost always low frequency and footfall, which means mass and isolation, not foam.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Spain.
02 / The build-up
What goes where, from the structure in
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Spain, split and multi-split systems dominate, with condensers in patios and light wells that act as reverberant shafts.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Spain, churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Spain, school buildings are concrete and tile with high ceilings and hard floors, and dining halls are the loudest rooms in the building.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
For a Spain practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What the buildings in Spain do to the specification
- Tile and terrazzo everywhere
Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.
- Season deadlines are real deadlines
Coastal and resort work has to be finished before the season opens. We give honest dispatch and transit windows rather than optimistic ones, so the fit-out is not waiting on a container.
- Late hours, homes above
Bars and restaurants run late underneath apartments. The complaint is almost always low frequency and footfall, which means mass and isolation, not foam.
- Sealed, air-conditioned rooms
Once a room is closed up against the heat it stops leaking sound outward and starts building it up inside. Absorption has to be balanced, not maximised.
- Assembly and performance rooms
Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times.
04 / Room by room
What each space in a Spain project needs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- PET felt acoustic panels, 4 to 24 mm
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Coastal and resort work has to be finished before the season opens. We give honest dispatch and transit windows rather than optimistic ones, so the fit-out is not waiting on a container.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
-

Plant and projection
Equipment noise into the auditorium, treated at source. Bars and restaurants run late underneath apartments. The complaint is almost always low frequency and footfall, which means mass and isolation, not foam.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- PET felt acoustic panels, 2440 x 4270 mm, 2.44 x 4.27 m, 8 x 14 ft
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Conditions
The Spain climate decides the material list
Spain is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Read this first
What we watch go wrong on jobs like this
-
A shared service void running across the wall line
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Spain job
Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.
05 / Route to site
What the route into Spain actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Valencia, Barcelona or Algeciras, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Valencia |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Valencia, Barcelona or Algeciras, then road to site. Air freight for samples and urgent quantities.
Questions from Spain projects
What makes cinema and multiplex soundproofing different in Spain?
Churches, civic auditoriums and hotel function rooms are stone and plaster volumes with very long decay times. Hard floors and rendered walls are the standard build. They reflect almost everything, so absorption on the ceiling usually does more than anything you add at eye level.
Where should the budget go first on a Spain project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Spain?
No. We manufacture in India and supply into Spain. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Spain site?
ships from: Palwal, Haryana, India, arrives at: Valencia, Barcelona or Algeciras, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.