Home > South Korea > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in South Korea

Auditorium acoustics and soundproofing in South Korea

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in South Korea

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.

Work reaching us from South Korea is mostly apartment towers, manufacturing plants, offices, hotels, schools, studios.

  • Noise between floors is the issue Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
  • Concrete towers throughout The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
  • Precise expectations Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in South Korea.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

How the layers stack, from the structure inwards

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In South Korea, central plant and split units, with risers and duct runs carrying noise between floors.

    Direct fix. Mechanically fixed to the soffit or wall. Durable and simple.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In South Korea, church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In South Korea, school and academy buildings are hard surfaced with long corridors and very intensive use.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

If you are specifying for a South Korea project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

What we see driving South Korea briefs

  • Noise between floors is the issue

    Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

  • Concrete towers throughout

    The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.

  • Precise expectations

    Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.

  • Two strong ports

    Busan and Incheon are both well served from India, so we route to whichever suits the site.

  • Assembly and performance rooms

    Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.

  • School and campus buildings

    School and academy buildings are hard surfaced with long corridors and very intensive use.

04 / Room by room

Where the money goes on a South Korea project

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Durability

The South Korea climate decides the material list

South Korea is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a South Korea job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Before you buy

What we watch go wrong on jobs like this

  • Absorbing the whole room and losing the back rows

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Adding speakers to fix a reverberation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Ignoring the rear wall because it is behind the audience

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic South Korea job

    Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

05 / Getting it there

Supply into South Korea, start to site

Supply into South Korea
Ships fromPalwal, Haryana, India
Arrives atBusan or Incheon, then road to site
Dispatch4 to 7 working days
FreightSea via Busan
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Busan or Incheon, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from South Korea projects

What makes auditorium acoustics and soundproofing different in South Korea?

Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

Where should the budget go first on a South Korea project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in South Korea?

No. We manufacture in India and supply into South Korea. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a South Korea site?

ships from: Palwal, Haryana, India, arrives at: Busan or Incheon, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.