For projects in Sao Paulo
Auditorium acoustics and soundproofing in Sao Paulo
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Sao Paulo
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
Work reaching us from Sao Paulo is mostly corporate towers, apartments, restaurants, hotels, clinics, studios, schools.
- Towers block, interiors ring Concrete frames handle airborne transfer. The complaint is nearly always that the room itself is too live.
- Traffic and helicopters Street noise and rotor noise reach upper floors through glazing rather than structure, so the facade is where the money goes.
- Impact between apartments Hard floors over slabs pass footfall down. The underlay has to go in before the finish, not after the complaint.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Sao Paulo.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Sao Paulo, split units and VRF, with condensers in light wells and on facades close to bedrooms.
On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Sao Paulo, churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Sao Paulo, classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.
Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
If you are specifying for a Sao Paulo project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What we see driving Sao Paulo briefs
- Towers block, interiors ring
Concrete frames handle airborne transfer. The complaint is nearly always that the room itself is too live.
- Traffic and helicopters
Street noise and rotor noise reach upper floors through glazing rather than structure, so the facade is where the money goes.
- Impact between apartments
Hard floors over slabs pass footfall down. The underlay has to go in before the finish, not after the complaint.
- Santos, then the climb inland
The port leg and the road leg are separate costs and separate time. We quote both rather than one.
- Assembly and performance rooms
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level.
- School and campus buildings
Classrooms are concrete and tile with high ceilings and hard floors, and covered play areas amplify everything.
04 / Room by room
Space by space, for Sao Paulo briefs
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Concrete frames handle airborne transfer. The complaint is nearly always that the room itself is too live.
- Wooden slat acoustic panels, MDF, FR MDF, HDF or HDHMR
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. Street noise and rotor noise reach upper floors through glazing rather than structure, so the facade is where the money goes.
- Wooden slat acoustic panels, 13-3, 14-2, 28-4 and 59-5
- PET felt acoustic panels, 4 to 24 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

Rear wall
The single worst surface in most halls, and the first one to treat. Hard floors over slabs pass footfall down. The underlay has to go in before the finish, not after the complaint.
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
- Ceiling baffles and clouds, ASTM C423
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate and durability
Durability in Sao Paulo, before acoustics is discussed
Sao Paulo is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
On a Sao Paulo job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Straight talk
Where this kind of project usually fails
-
Absorbing the whole room and losing the back rows
Small on the drawing, expensive on site, and almost always found after handover.
-
Adding speakers to fix a reverberation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Ignoring the rear wall because it is behind the audience
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating it as a generic Sao Paulo job
Concrete frames handle airborne transfer. The complaint is nearly always that the room itself is too live.
05 / Getting it there
How material reaches a Sao Paulo site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Santos, then road up to Sao Paulo |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Santos |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into Santos, then road up to Sao Paulo. Air freight for samples and urgent quantities.
Questions from Sao Paulo projects
What makes auditorium acoustics and soundproofing different in Sao Paulo?
Churches, event halls and auditoriums are large hard rooms carrying amplified music at high level. Concrete frames handle airborne transfer. The complaint is nearly always that the room itself is too live.
Where should the budget go first on a Sao Paulo project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Sao Paulo?
No. We manufacture in India and supply into Sao Paulo. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Sao Paulo site?
ships from: Palwal, Haryana, India, arrives at: Santos, then road up to Sao Paulo, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.