Home > San Francisco > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in San Francisco

Cinema and multiplex soundproofing in San Francisco

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a San Francisco job

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

Work reaching us from San Francisco is mostly victorian conversions, tech offices, apartments, studios, restaurants, clinics.

  • Timber Victorians Light framed, over a century old, and divided into flats. Low frequency passes easily and footfall travels straight down.
  • Depth costs real money At local rates a wall growing into the room is a significant number. A dense thin membrane usually beats a thicker framed build-up on total cost.
  • Designed to move Seismic detailing requires junctions that stay flexible, so the acoustic layer must not stiffen across them.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in San Francisco.

Multiplex and cinema soundproofing

02 / The build-up

The build-up, layer by layer

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In San Francisco, packaged rooftop units and ducted forced air are standard, so noise arrives through the duct rather than through the wall. Lining the first three metres of duct and treating the return path is usually the whole job.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In San Francisco, churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In San Francisco, public school buildings run long corridors with hard floors and lay-in tile ceilings that were chosen for cost, not for speech. Classroom reverberation and corridor spill are the two complaints, and both respond to ceiling area rather than wall panels.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What decides the build-up in San Francisco

  • Timber Victorians

    Light framed, over a century old, and divided into flats. Low frequency passes easily and footfall travels straight down.

  • Depth costs real money

    At local rates a wall growing into the room is a significant number. A dense thin membrane usually beats a thicker framed build-up on total cost.

  • Designed to move

    Seismic detailing requires junctions that stay flexible, so the acoustic layer must not stiffen across them.

  • Oakland is close

    A short road leg after the port keeps landed cost and timing predictable.

  • Assembly and performance rooms

    Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both.

04 / Room by room

What each space in a San Francisco project needs

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. Light framed, over a century old, and divided into flats. Low frequency passes easily and footfall travels straight down.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. At local rates a wall growing into the room is a significant number. A dense thin membrane usually beats a thicker framed build-up on total cost.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Seismic detailing requires junctions that stay flexible, so the acoustic layer must not stiffen across them.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Durability

What the San Francisco climate rules in and rules out

San Francisco is mild summers and cold, wet winters, and that narrows the material list before acoustics is discussed.

Cold external walls and long heating seasons make condensation behind a lining the thing to design out. PET felt is unaffected by damp air.

The failure we design against here is condensation and cold bridging behind new linings.

On a San Francisco job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • A shared service void running across the wall line

    The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.

  • Treating the auditorium to fix bleed from the next screen

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Doors and lobbies specified late and undersized

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating it as a generic San Francisco job

    Light framed, over a century old, and divided into flats. Low frequency passes easily and footfall travels straight down.

05 / Logistics

How material reaches a San Francisco site

Supply into San Francisco
Ships fromPalwal, Haryana, India
Arrives atOakland, then a short road run across the bay
Dispatch4 to 7 working days
FreightSea via Oakland
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into Oakland, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from San Francisco projects

What makes cinema and multiplex soundproofing different in San Francisco?

Churches, school gyms and multipurpose halls double as performance spaces, which means a room designed for neither speech nor music has to carry both. Light framed, over a century old, and divided into flats. Low frequency passes easily and footfall travels straight down.

Where should the budget go first on a San Francisco project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in San Francisco?

No. We manufacture in India and supply into San Francisco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a San Francisco site?

ships from: Palwal, Haryana, India, arrives at: Oakland, then a short road run across the bay, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.