Manufactured in India, supplied in Panipat
Soundproofing materials in Panipat
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Panipat. Panipat is ninety kilometres from our plant and runs on textiles and recycling, so most of what we send goes into working units.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.
01 / Start here
What this is, and what it changes in a Panipat room
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Panipat is mostly textile and recycling units, workshops, offices, showrooms, schools, clinics, banquet halls.
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Panipat.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Data sheet
Published specification, identical wherever we ship it
We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
03 / In this market
What the buildings in Panipat do to the specification
- Machinery, long shifts
Looms and processing machinery run continuously. Enclosure or barrier at the machine is the honest fix, not lining the hall.
- Ninety kilometres away
Same or next day delivery, immediate samples, and problems sorted in person rather than over email.
- Units beside housing
Noise leaving the building matters as much as noise inside it, and the two need different treatments.
- Cabins inside sheds
An office built into an industrial building has a noise floor nobody planned for. Mass in the partition beats any ceiling tile.
- Plant and HVAC
Dense industrial belts mean compressors, presses, generator sets and blower plant sit close to offices and canteens.
- The housing stock
Builder floors and RC frame apartments with tile and stone floors, often built floor by floor for separate households.
If you are specifying for a Panipat project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
04 / Climate and durability
Why the climate in Panipat changes the material, not the target
Panipat is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The risk we design against here is wet-season humidity behind linings.
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
05 / Route to site
What the route into Panipat actually looks like
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | same or next day |
| Dispatch | 2 to 4 working days |
| To site | same or next day |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
Same or next day by road from Palwal, about ninety kilometres. A shared vehicle or a dedicated truck, whichever suits the quantity.
06 / Worth knowing
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Square footage quoted before the room is understood
Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.
-
Suppliers who imply a Panipat presence
Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.
07 / In projects
In finished rooms
Panipat: questions we are actually asked
Are these soundproofing materials made in Panipat?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Panipat as the manufacturer rather than through a dealer. Panipat is ninety kilometres from our plant and runs on textiles and recycling, so most of what we send goes into working units. You buy at factory prices with one consistent batch across the order.
What decides the specification for a Panipat project?
Looms and processing machinery run continuously. Enclosure or barrier at the machine is the honest fix, not lining the hall. Same or next day delivery, immediate samples, and problems sorted in person rather than over email. Those two things move the build-up far more than the panel figure does.
Will this material last in the Panipat climate?
Panipat is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.
How quickly can material reach a site in Panipat?
made at: Our own plant, Palwal, Haryana, reaches site in: same or next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
How is the order packed and what is the minimum?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.