Manufactured in India, supplied in Nigeria
Soundproofing materials in Nigeria
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Nigeria. Made at our own plant in India and shipped into Lagos or Onne.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.
01 / Start here
What this is, and what it changes in a Nigeria room
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Nigeria is mostly places of assembly, offices, hotels, generator and plant enclosures, schools, hospitals.
Concrete and block construction with hard floors. Estates and apartment blocks sit close together with generators between them.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Nigeria.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification sheet
Published specification, identical wherever we ship it
The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
03 / On the ground
The Nigeria conditions that change the answer
- Generators are a permanent condition
Standby generation runs constantly in many buildings and sits close to occupied space. Enclosure and mass, not absorption, is the answer.
- Very large assembly halls
Congregations in the thousands in hard concrete volumes. Intelligibility fails long before anyone describes the room as echoey.
- Port congestion is real
Lagos can be slow to clear. We quote a realistic window rather than a best case, and we will say if another port suits you better.
- Humid and hot
PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.
- Plant and HVAC
Split units and diesel generator sets, with generation running often enough that enclosure matters more than the HVAC.
- The housing stock
Concrete and block construction with hard floors. Estates and apartment blocks sit close together with generators between them.
Architects working in Nigeria usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Climate
The Nigeria climate decides the material list
Nigeria is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The risk we design against here is mould, sagging fabric finishes and swelling in timber.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Supply
Getting it to Nigeria, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Lagos or Onne, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Lagos or Onne |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Lagos or Onne, then road to site. Air freight for samples and urgent quantities.
06 / Before you buy
What we will tell you that a reseller will not
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
A number chased without a measurement
If nobody has measured the room or set a target, the specification is a guess with a decimal point in it. We will ask for the target before we quote the quantity.
-
A claim of being local to Nigeria
We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.
07 / In projects
In finished rooms
Nigeria: questions we are actually asked
Do you manufacture soundproofing materials in Nigeria?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Nigeria as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Lagos or Onne. You buy at factory prices with one consistent batch across the order.
What do you look at first on a Nigeria enquiry?
Standby generation runs constantly in many buildings and sits close to occupied space. Enclosure and mass, not absorption, is the answer. Congregations in the thousands in hard concrete volumes. Intelligibility fails long before anyone describes the room as echoey. Those two things move the build-up far more than the panel figure does.
Is this the right material for Nigeria conditions?
Nigeria is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.
What is the delivery time into Nigeria?
ships from: Palwal, Haryana, India, arrives at: Lagos or Onne, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What should you not buy soundproofing materials for?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What quantity do we have to order, and in what packaging?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Drawings in, BOQ and a delivered date out
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.