Home > Netherlands > Cinema and multiplex soundproofing
For projects in Netherlands
Cinema and multiplex soundproofing in Netherlands
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Netherlands
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
Work reaching us from Netherlands is mostly apartments, offices, schools, healthcare, studios, hospitality.
- Timber floors in canal houses Old narrow houses carry footfall down every floor. A resilient layer under the finish does more than a treatment applied below.
- Lightweight new build Efficient construction means less mass. Where mass is missing, a dense membrane is usually the cheapest honest fix.
- Recycled content matters here PET felt is made from recycled bottle flake, which is the first question most Dutch specifiers ask and the easiest one for us to answer.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Netherlands.
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Netherlands, balanced mechanical ventilation is standard, so duct and terminal unit noise replace open window noise.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Netherlands, church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Netherlands, school buildings are well insulated and airtight with hard cleanable surfaces, so rooms stay live and ventilation noise is always present.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
If you are specifying for a Netherlands project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What we see driving Netherlands briefs
- Timber floors in canal houses
Old narrow houses carry footfall down every floor. A resilient layer under the finish does more than a treatment applied below.
- Lightweight new build
Efficient construction means less mass. Where mass is missing, a dense membrane is usually the cheapest honest fix.
- Recycled content matters here
PET felt is made from recycled bottle flake, which is the first question most Dutch specifiers ask and the easiest one for us to answer.
- Damp, mild climate
Our felt does not absorb moisture, shed fibre or feed mould, which suits cold external walls and sealed rooms.
- Assembly and performance rooms
Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
04 / Room by room
What each space in a Netherlands project needs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Old narrow houses carry footfall down every floor. A resilient layer under the finish does more than a treatment applied below.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic carpet and rugs, 4 mm
- PET felt acoustic panels, 4 to 24 mm
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Efficient construction means less mass. Where mass is missing, a dense membrane is usually the cheapest honest fix.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic carpet and rugs, High density polyester
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
-

Plant and projection
Equipment noise into the auditorium, treated at source. PET felt is made from recycled bottle flake, which is the first question most Dutch specifiers ask and the easiest one for us to answer.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic carpet and rugs, Felt
- PET felt acoustic panels, 2440 x 4270 mm, 2.44 x 4.27 m, 8 x 14 ft
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Durability
Why the climate in Netherlands changes the material, not the target
Netherlands is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Where a consultant is already engaged on a Netherlands project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
A shared service void running across the wall line
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic Netherlands job
Old narrow houses carry footfall down every floor. A resilient layer under the finish does more than a treatment applied below.
05 / Supply
Getting it to Netherlands, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Rotterdam, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Rotterdam |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order.
Sea freight into Rotterdam, then road to site. Being close to the port keeps inland cost low. Air freight for samples and urgent quantities.
Questions from Netherlands projects
What makes cinema and multiplex soundproofing different in Netherlands?
Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout. Old narrow houses carry footfall down every floor. A resilient layer under the finish does more than a treatment applied below.
Where should the budget go first on a Netherlands project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Netherlands?
No. We manufacture in India and supply into Netherlands. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Netherlands site?
ships from: Palwal, Haryana, India, arrives at: Rotterdam, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.