For projects in Nepal
Office acoustics and soundproofing in Nepal
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units and generator sets, with generators close to occupied rooms during outages.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What you are buying, and what it fixes in Nepal
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Split units and generator sets, with generators close to occupied rooms during outages.
Work reaching us from Nepal is mostly hotels and guest houses, offices, hospitals, schools, assembly halls, houses.
- Reached entirely by road No port, no container, no sea leg. That keeps lead times short and makes small or repeat orders practical in a way they are not for most export markets.
- Rebuilt and reinforced structures A great deal of stock has been rebuilt or retrofitted for seismic performance. Movement joints must stay free and an acoustic layer must not stiffen across them.
- Hospitality in dense valleys Hotels and guest houses packed into tight streets where street noise reaches rooms through openings rather than walls.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Nepal.
Office and conference room acoustics Acoustic office screens
02 / The build-up
What goes where, from the structure in
-

Layer 1
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Nepal, split units and generator sets, with generators close to occupied rooms during outages.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Nepal, temples, function halls and conference rooms are hard volumes carrying amplified speech and music.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
-

Layer 3
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Nepal, classrooms are concrete and tile with large class sizes and street noise through open windows.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
Architects working in Nepal usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What we see driving Nepal briefs
- Reached entirely by road
No port, no container, no sea leg. That keeps lead times short and makes small or repeat orders practical in a way they are not for most export markets.
- Rebuilt and reinforced structures
A great deal of stock has been rebuilt or retrofitted for seismic performance. Movement joints must stay free and an acoustic layer must not stiffen across them.
- Hospitality in dense valleys
Hotels and guest houses packed into tight streets where street noise reaches rooms through openings rather than walls.
- Packing for mountain roads
The final leg is often on rough road. We brace and wrap for that rather than for a smooth port transfer.
- Plant and HVAC
Split units and generator sets, with generators close to occupied rooms during outages.
04 / Room by room
What each space in a Nepal project needs
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. No port, no container, no sea leg. That keeps lead times short and makes small or repeat orders practical in a way they are not for most export markets.
- Ceiling baffles and clouds, 100% PET non-woven, the panel family
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic carpet and rugs, High density polyester
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. A great deal of stock has been rebuilt or retrofitted for seismic performance. Movement joints must stay free and an acoustic layer must not stiffen across them.
- Ceiling baffles and clouds, 9 to 24 mm
- PET felt acoustic panels, 4 to 24 mm
- Acoustic carpet and rugs, Felt
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Hotels and guest houses packed into tight streets where street noise reaches rooms through openings rather than walls.
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Durability
The Nepal climate decides the material list
Nepal is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Where a consultant is already engaged on a Nepal project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Worth knowing
The six errors that cost the most
-
Lining every wall while leaving the ceiling bare
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating a privacy problem with absorption
Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.
-
Glass cabins specified without a door and head detail
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Nepal job
No port, no container, no sea leg. That keeps lead times short and makes small or repeat orders practical in a way they are not for most export markets.
05 / Getting it there
How material reaches a Nepal site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Overland through the India border, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Road via the India border |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Overland by road through the India border, then on to site. No sea leg and no port handling.
Questions from Nepal projects
What makes office acoustics and soundproofing different in Nepal?
Split units and generator sets, with generators close to occupied rooms during outages. No port, no container, no sea leg. That keeps lead times short and makes small or repeat orders practical in a way they are not for most export markets.
Where should the budget go first on a Nepal project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Nepal?
No. We manufacture in India and supply into Nepal. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Nepal site?
ships from: Palwal, Haryana, India, arrives at: Overland through the India border, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.