Home > Munich > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Munich

Soundproofing materials in Munich

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Munich. Made at our own plant in India, shipped in container loads to Bavarian sites and specified against your drawings before anything leaves the factory.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

Manufacturer, not reseller. We hold no local approvals and will not imply we do. You get the price the factory quotes, material that matches across a large order, and advice that sometimes talks you out of a purchase.

01 / Start here

What this material is and where it earns its place in Munich

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Munich is mostly apartments and villas, corporate floors, studios, hotels, clinics, schools.

Altbau blocks have solid masonry walls and timber joist floors, so airborne noise is controlled but footfall is not. Neubau is concrete with better floors and much harder surfaces.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Munich.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Data sheet

The numbers, and they do not move by city

These figures are published and they do not move. The thing worth arguing about is not the number on the sheet, it is which grade and which build-up suits the room you are treating.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

03 / On the ground

What we see driving Munich briefs

  • Altbau above, concrete below

    A stucco ceilinged Altbau flat and a post-war concrete block need different answers to the same complaint. We ask which one you are in before we quote anything.

  • Specified, with numbers attached

    Send us the acoustician report and the target values. We will tell you what our build-up gets to and where it falls short, in writing, before you commit.

  • Floor area is expensive here

    Every centimetre the wall grows into the room is money. A dense membrane plus a resilient layer usually beats a thick framed build-up on both cost and depth.

  • Corporate and studio work

    Head office floors, media rooms and production studios around the city want measured performance and a finish that survives a design review.

  • Plant and HVAC

    Mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.

  • The housing stock

    Altbau blocks have solid masonry walls and timber joist floors, so airborne noise is controlled but footfall is not. Neubau is concrete with better floors and much harder surfaces.

We would rather argue about the build-up at design stage than on site. See how we support architects.

04 / Conditions

Why the climate in Munich changes the material, not the target

Munich is cool and damp, with long heating seasons and cold external walls, and that narrows the sensible material list before acoustics is even discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The risk we design against here is condensation behind linings in older, poorly insulated stock.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

05 / Getting it there

What the route into Munich actually looks like

Supply into Munich
Ships fromPalwal, Haryana, India
Arrives atHamburg or Bremerhaven, then rail and road south to Bavaria
Dispatch4 to 7 working days
FreightSea via Hamburg
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Sea freight into Hamburg or Bremerhaven, then rail and road south. It is a long inland leg and we build it into the dates we give you rather than pretending it is not there.

06 / Worth knowing

The things worth knowing before you place the order

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • A claim of being local to Munich

    We manufacture in India and supply here. We do not run an office in this city and we will not pretend to, because you would find out on the first site visit.

07 / In projects

In finished rooms

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Munich: questions we are actually asked

Where are the soundproofing materials you supply to Munich actually made?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Munich as the manufacturer rather than through a dealer. Made at our own plant in India, shipped in container loads to Bavarian sites and specified against your drawings before anything leaves the factory. You buy at factory prices with one consistent batch across the order.

Why would a Munich build-up differ from anywhere else?

A stucco ceilinged Altbau flat and a post-war concrete block need different answers to the same complaint. We ask which one you are in before we quote anything. Send us the acoustician report and the target values. We will tell you what our build-up gets to and where it falls short, in writing, before you commit. Those two things move the build-up far more than the panel figure does.

How does the Munich climate affect this product?

Munich is cool and damp, with long heating seasons and cold external walls. Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would. The failure we design against here is condensation behind linings in older, poorly insulated stock.

What is the delivery time into Munich?

ships from: Palwal, Haryana, India, arrives at: Hamburg or Bremerhaven, then rail and road south to Bavaria, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.

Where do soundproofing materials fail to help?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

What is the minimum order and how is it packed?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send a plan and a section, get a real build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.