Home > Mumbai > SoundBlanket mass loaded vinyl

SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

Manufactured in India, supplied in Mumbai

SoundBlanket mass loaded vinyl in Mumbai

We manufacture soundBlanket mass loaded vinyl at our own plant at Palwal in Haryana, India, and supply them into Mumbai. Mumbai gives us the smallest rooms and the hardest briefs in the country.

Density
2100 kg per cubic metre
2.5 mm
STC 30, 5.25 kg per sq m
4 mm
STC 34, 8.4 kg per sq m
6 mm
12.6 kg per sq m, STC on request
Roll size
5 x 1.2 m, 6 sq m per roll
Lead time
4 to 7 working days
Minimum order
From 10 rolls
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs
  • Test reports sent on request, not just quoted

We make this ourselves and ship it to you. No local branch, no borrowed certifications, no dealer margin. One batch across the whole order, and an honest answer when the product is wrong for the problem.

01 / The material

What this is, and what it changes in a Mumbai room

A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. It is the barrier product, not an absorber, and it is the right answer when the problem is noise passing through a structure.

Work reaching us from Mumbai is mostly recording studios, offices, flats and redevelopment towers, restaurants, clinics, schools.

Towers and chawls side by side, in RC frame with tile floors. Redevelopment stock shares slabs and lift cores, and monsoon damp rules out anything that holds moisture.

  • Wall, decoupled Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
  • Floor, floating Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
  • Duct and plant wrap Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
  • What it will not do Mass fixed hard to an existing wall gives far less than the same mass on an independent leaf. If we are told the wall cannot be thickened, we will say what the membrane will and will not achieve rather than quote the laboratory figure and let the site find out.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for SoundBlanket MLV are on the main product page. This page covers what that means for a project in Mumbai.

SoundBlanket mass loaded vinyl

02 / Data sheet

The numbers, and they do not move by city

We publish one data sheet for every market. If a supplier quotes you a different figure for the same product in a different city, one of the two numbers is wrong.

  • 2.5 mmSTC 30, 5.25 kg per sq m. Ducts, light partitions, retrofit where depth is tight
  • 4 mmSTC 34, 8.4 kg per sq m. Party walls, floors, plant rooms, the common specification
  • 6 mm12.6 kg per sq m. Machine enclosures and low frequency problems
SoundBlanket mass loaded vinyl: published specification
Density2100 kg per cubic metre
2.5 mmSTC 30, 5.25 kg per sq m
4 mmSTC 34, 8.4 kg per sq m
6 mm12.6 kg per sq m, STC on request
Roll size5 x 1.2 m, 6 sq m per roll
FormLimp sheet, cuts with a knife, seams lapped and sealed

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

03 / Local conditions

What decides the build-up in Mumbai

  • Every centimetre is paid for

    At Mumbai rates a wall that grows a hundred millimetres into the room costs real money. A dense membrane with a resilient break usually beats a thick framed build-up here.

  • The studio capital

    More recording and dubbing rooms per square kilometre than anywhere else we supply. They sit inside occupied buildings, so isolation comes before tuning, always.

  • Monsoon damp defeats the wrong material

    PET felt does not absorb moisture, shed fibre or feed mould. Mineral products sag here within a couple of seasons.

  • Redevelopment, built fast

    Old buildings replaced by towers on tight programmes. Acoustic detail is easy to lose unless it is specified before the slab is poured.

  • The housing stock

    Towers and chawls side by side, in RC frame with tile floors. Redevelopment stock shares slabs and lift cores, and monsoon damp rules out anything that holds moisture.

  • The studio and content scene

    The deepest film, dubbing and music production base in the country, with rooms built inside commercial and residential buildings under real neighbour constraints.

If you are specifying for a Mumbai project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

04 / Conditions

Why the climate in Mumbai changes the material, not the target

Mumbai is warm and humid through most of the year, with a long wet season, and that narrows the sensible material list before acoustics is even discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The risk we design against here is mould, sagging fabric finishes and swelling in timber.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

05 / Supply

Getting it to Mumbai, with real dates

Supply into Mumbai
Made atOur own plant, Palwal, Haryana
Reaches site inthree to four days
Dispatch2 to 4 working days
To sitethree to four days
PackingRolls on core tubes, wrapped and end capped, 5 x 1.2 m. Weights on the packing list, because a full roll is heavy and site access matters.
Lead time4 to 7 working days. Full container quantities scheduled against the vessel.

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly fourteen hundred kilometres, normally three to four days on a dedicated truck.

10 rolls for 2.5 mm and 4 mm. Other thicknesses are made to order at 10 tonnes per thickness.

Minimum order, soundblanket mass loaded vinyl
2.5 mm10 rolls, 60 sq m, about 315 kg
4 mm10 rolls, 60 sq m, about 504 kg
6 mm and other thicknesses10 tonnes per thickness

A SoundBlanket roll is 5 x 1.2 m, which is 6 sq m. At 2100 kg per cubic metre a roll weighs about 31.5 kg at 2.5 mm and about 50.4 kg at 4 mm, so a 10 roll minimum is 60 sq m and roughly 315 kg at 2.5 mm or 504 kg at 4 mm.

06 / Straight talk

Four honest warnings before you buy

  • The wrong product for the problem

    Mass fixed hard to an existing wall gives far less than the same mass on an independent leaf. If we are told the wall cannot be thickened, we will say what the membrane will and will not achieve rather than quote the laboratory figure and let the site find out.

  • Coverage bought instead of a target

    Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.

  • Suppliers who imply a Mumbai presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

FAQ

Mumbai: questions we are actually asked

Where are the soundBlanket mass loaded vinyl you supply to Mumbai actually made?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Mumbai as the manufacturer rather than through a dealer. Mumbai gives us the smallest rooms and the hardest briefs in the country. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Mumbai job?

At Mumbai rates a wall that grows a hundred millimetres into the room costs real money. A dense membrane with a resilient break usually beats a thick framed build-up here. More recording and dubbing rooms per square kilometre than anywhere else we supply. They sit inside occupied buildings, so isolation comes before tuning, always. Those two things move the build-up far more than the panel figure does.

Will this material last in the Mumbai climate?

Mumbai is warm and humid through most of the year, with a long wet season. Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them. The failure we design against here is mould, sagging fabric finishes and swelling in timber.

When would material land on a Mumbai site?

made at: Our own plant, Palwal, Haryana, reaches site in: three to four days, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

When are soundBlanket mass loaded vinyl the wrong purchase?

Mass fixed hard to an existing wall gives far less than the same mass on an independent leaf. If we are told the wall cannot be thickened, we will say what the membrane will and will not achieve rather than quote the laboratory figure and let the site find out.

Is there a minimum order, and how does it arrive?

10 rolls for 2.5 mm and 4 mm. Other thicknesses are made to order at 10 tonnes per thickness. 2.5 mm, 10 rolls, 60 sq m, about 315 kg. 4 mm, 10 rolls, 60 sq m, about 504 kg. 6 mm and other thicknesses, 10 tonnes per thickness. A SoundBlanket roll is 5 x 1.2 m, which is 6 sq m. At 2100 kg per cubic metre a roll weighs about 31.5 kg at 2.5 mm and about 50.4 kg at 4 mm, so a 10 roll minimum is 60 sq m and roughly 315 kg at 2.5 mm or 504 kg at 4 mm. Rolls on core tubes, wrapped and end capped, 5 x 1.2 m. Weights on the packing list, because a full roll is heavy and site access matters.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.