For projects in Morocco
Recording studio acoustics and soundproofing in Morocco
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A growing film and production sector using converted buildings with good mass and hard surfaces.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
The material, and what it actually does on a Morocco job
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
A growing film and production sector using converted buildings with good mass and hard surfaces.
Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.
- Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Morocco.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 2
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
-

Layer 3
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
For a Morocco practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What the buildings in Morocco do to the specification
- Two very different markets
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces
Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub
Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Hot and dry inland, humid on the coast
PET felt is stable in both and does not sag, shed fibre or hold moisture.
- The housing stock
Concrete and block construction with tile and zellige floors, in blocks around courtyards that reflect sound between homes.
- The studio and content scene
A growing film and production sector using converted buildings with good mass and hard surfaces.
04 / Room by room
What each space in a Morocco project needs
-

Isolation
A measured background level, agreed before anything is bought. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Soundproof curtains, 5.5 kg per sq m
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Soundproof curtains, Up to 30 dB
-

Early reflections
Controlled at the mix position, and only there. Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Soundproof curtains, 30
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Conditions
What the Morocco climate rules in and rules out
Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Where a consultant is already engaged on a Morocco project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
The six errors that cost the most
-
Buying foam to solve an isolation problem
This is the one that comes back as a second fit-out rather than a snag.
-
Treating the room before the shell is isolated
It sounds like a small detail until the room is finished and the complaint arrives.
-
Killing the room completely and calling it controlled
A room can be over-treated. Past the target it stops sounding controlled and starts sounding dead, and you paid for that.
-
Treating it as a generic Morocco job
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
05 / Supply
Getting it to Morocco, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Tanger Med or Casablanca, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Tanger Med |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.
Questions from Morocco projects
What makes recording studio acoustics and soundproofing different in Morocco?
A growing film and production sector using converted buildings with good mass and hard surfaces. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
Where should the budget go first on a Morocco project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Morocco?
No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Morocco site?
ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.