Home > Morocco > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Morocco

Recording studio acoustics and soundproofing in Morocco

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A growing film and production sector using converted buildings with good mass and hard surfaces.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Morocco job

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A growing film and production sector using converted buildings with good mass and hard surfaces.

Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.

  • Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
  • Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
  • Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Morocco.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

How the layers stack, from the structure inwards

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  2. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 2

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  3. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 3

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

For a Morocco practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / In this market

What the buildings in Morocco do to the specification

  • Two very different markets

    Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

  • Traditional buildings, hard surfaces

    Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.

  • Tanger Med is a major hub

    Frequent sailings and good onward connections make this one of the easier African routes to plan around.

  • Hot and dry inland, humid on the coast

    PET felt is stable in both and does not sag, shed fibre or hold moisture.

  • The housing stock

    Concrete and block construction with tile and zellige floors, in blocks around courtyards that reflect sound between homes.

  • The studio and content scene

    A growing film and production sector using converted buildings with good mass and hard surfaces.

04 / Room by room

What each space in a Morocco project needs

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. Frequent sailings and good onward connections make this one of the easier African routes to plan around.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Conditions

What the Morocco climate rules in and rules out

Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Where a consultant is already engaged on a Morocco project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • Buying foam to solve an isolation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating the room before the shell is isolated

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Killing the room completely and calling it controlled

    A room can be over-treated. Past the target it stops sounding controlled and starts sounding dead, and you paid for that.

  • Treating it as a generic Morocco job

    Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

05 / Supply

Getting it to Morocco, with real dates

Supply into Morocco
Ships fromPalwal, Haryana, India
Arrives atTanger Med or Casablanca, then road to site
Dispatch4 to 7 working days
FreightSea via Tanger Med
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Morocco projects

What makes recording studio acoustics and soundproofing different in Morocco?

A growing film and production sector using converted buildings with good mass and hard surfaces. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

Where should the budget go first on a Morocco project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Morocco?

No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Morocco site?

ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.